SPA ENCLOSURE
5
1.
Assemble the 4 caster wagons accord ing to the illustrations (Fig.AA,
DD,EE) and bolt them loosely.
Note:
the parts of material with Velcro
that are fixed under the caster wa gons are attached to the fabr ics
of the movable sections
2.
Assemble the arches of the mov able structures on the ground, as
illustrated on page SPA-400
3.
With the assistance of another person, slip the structures by the front
and back end of the pr incipal structure, taking care not to r ub the
fabric of the principal structure with the caster wagons
4.
Adjust or slip the wheeled bracket under the rails
5.
Firmly tighten the bolts of the caster wagons
Step 6: Installation of the fabrics on the two sections of movable roof
1.
Slip the fabri c by th e side. Attach the Velcro ba nds of th e fabr ic
below the wagon on each side (Fig.FF)
2.
Very important:
in order to make sure that the fabric is well centered
and on the r ight side of the mov able structure, fix the eyel et that is
in the center of the fabric so it is at the ridge of the arch towards the
center of the shelter, then i nsert the eyelet i nto the bolt of part #3
(Fig.CC)
3.
Fold up the fabr ic towards the i nterior of the arch and begi n lacing
with the c ord, starting on one si de towards the opposi te side, using
the doubled method (F ig.GG, Y), without however putting the f inal
tension
4.
Use of retaining straps (Fig.HH)