SPA ENCLOSURE
1
Thank you for choosing a Harnois product. We recommend that you read carefully the
following instructions and recommendations
IMPORTANT:
•
Keep your invoice or proof of purchase.
•
For any question call our after sales service department at 1-866-661-6646.
Before
the
installation,
check
these
points
We recommend you to follow those 6 steps to assemble your SPA Shelter
Step 1: Assembly of the principal structure
Step 2: Assembly of the posts for the ends
Step 3: Installation of the fabric on the principal structure
Step 4: Assembly of the front door’s hardware
Step 5: Assembly of the movable structures and its components
Step 6: Installation of the fabrics on the two sections of movable roof
Points to be checked when assembling:
1.
Before assembling, gather the parts together in groups according to
the illustrations on page SPA-900
2.
Important:
The corner arches #3 of the pri ncipal structure and the
corner arches #38 of the mov
able structures are practi
cally
identical. T hey cannot be rev ersed w hen assembl ing. Therefore,
make sur e that they are fi xed to the r ight structure. Measure the
width at the base according to the illustrations on page SPA-900
3.
Important:
The cent er arches #1 are practi cally i dentical to the
center arches #2 , except for the holes dri lled on the si de (#1). The
centers #1 must be fi xed to the fi rst an d last arc h of the pri ncipal
structure in order to bolt the posts #13 at the ends
4.
The term arch represents the assembly of: a center #1 or # 2 , + 2
corners # 3 or 38, + 2 posts # 7 or 8.
Important:
the center arches #1
of the fir st and last arch are ident ical and hav e two holes to fix the
posts #13 at the ends of the structur
e. Those of the second and
fourth arch are different (without hole)