Installing the HRR 4104
HRR 4104 Return Path Receiver Product Manual Rev A (3/05)
2–3
To install the HMC 4008 carrier into the HLP 4200 Platform:
1. Lower the control/display panel on the HLP 4200 Platform.
2. Slide the HMC 4008 module carrier into any available slot until it is
properly seated.
3. Lock the carrier into position with the carrier locking screw, shown in
To install the HRR 4104 receiver module into the HMC 4008 carrier:
•
Insert the receiver module into the carrier until it locks in position. This
requires some force as there are four blind mate connectors in the rear of
the unit.
The HRR 4104 receives power from the HMC 4008 module carrier. The carrier
is powered by the +24 VDC bus of the HLP 4200.
For additional information on the HLP 4200 Platform and its associated
communication and power buses, see the
HLP 4200 Platform Product Manual
.
For further information on the platform controller and power supply options,
see the
CPS 4200/4248 Controller/Power Supply Product Manual.
To remove the HRR 4104 receiver module from the HMC 4008 carrier:
1. Press
Eject
on the HRR 4104 module, as shown in Figure 2-2. The lever
raises approximately 10 degrees, as shown.
2. Insert your finger under the tab at the bottom of the lever, then lift up on
the lever. This disengages the blind mate RF connectors from the HMC
4008 carrier.
3. Remove the module from the carrier.
Figure 2-2. HRR 4104 side view with lever open
Lever
Eject (press here)
Tab (lift up here)
Содержание HRR 4104
Страница 1: ...HRR 4104 Return Path Receiver Product Manual Manual Part No 700 0051981 Rev A March 2005...
Страница 8: ...Overview 1 4 Copyright 2005 Harmonic Inc...
Страница 18: ...User Interface Options 3 2 Copyright 2005 Harmonic Inc Figure 3 1 HLP 4200WD Platform Main menu display...
Страница 36: ...Maintenance and Troubleshooting 5 6 Copyright 2005 Harmonic Inc...
Страница 40: ...Technical Specifications A 4 Copyright 2005 Harmonic Inc...
Страница 42: ...Harmonic Inc Offices B 2 Copyright 2005 Harmonic Inc...