background image

SL600HD PINNACLE STAIR LIFT:

 

Install Manual

25MAR2022  |  75403 E

6

PREPARATION

PINNACLE HD STAIR LIFT: SECTION 3

SECTION 3

PREPARATION

Installations may vary to some degree, but below 

are the basic tools to have on hand for a Pinnacle 

stair lift installation.

If you have any questions, concerns or comments, 

please contact our Technical Service Department at 

800-833-0478 or [email protected]

REQUIRED TOOLS

• 

Cordless drill

• 

Allen wrenches (5/64", 5/32", 3/16", 5/16")

• 

Phillips screwdriver (#3)

• 

Nut driver (3/8", 5/16")

• 

6" - 10" driver extension

• 

Level

• 

Hack saw or chop saw

• 

SAE socket set

• 

SAE wrenches

• 

Tape measure

• 

Volt meter

INCLUDED PARTS 

Before beginning installation, inspect and check 

the box contents and report any damage or missing 

items to Harmar. 

CHASSIS BOX CONTENT:

• 

Chassis

• 

Call / send parts

• 

Two (2) call/send hand controls

• 

Battery charger

• 

Manual override tool 

(optional)

RAIL BOX CONTENT:

• 

Bottom rail pre-installed with: 

 

Bottom end plate

 

Charge strip wire harness

• 

Bottom limit cam

• 

Joint pins and joint brackets 

(two-piece rail only)

• 

Plastic gear rack

• 

Top rail pre-installed with charge strip wire 

harness. 

• 

Rail accessories 

(plastic bag)

 with: 

 

Top end plate

 

Compression bolts 

(2 sizes)

 

Self-cutting screws 1/4"-20 x 1"

 

Torx T30 driver bit

 

Extra plastic racks 

(2 or 3)

 

Top limit cam

RAIL BRACKET BOX:

• 

Rail brackets (2, 3, 4, or 6 per set)

• 

Wood screws #14 x 2" (Four (4) per rail bracket)

CHAIR AND FOOTREST BOX:

• 

Chair

• 

Back rest

• 

Seat belt

• 

Footrest complete with swivel slide rails and 

swivel pin bracket

• 

Rear seat support

Содержание PINNACLE SL600HD

Страница 1: ...25MAR2022 75403 E PINNACLE STAIR LIFT INSTALLATION SERVICE MANUAL SL600HD...

Страница 2: ......

Страница 3: ...d Tools 6 Included Parts 6 INSTALLATION 7 Determine Overall Rail Length 7 Installation Site Electrical Requirements 8 Rail Installation 8 Zero Intrusion Installation 10 Chassis Installation 11 Final R...

Страница 4: ...ons and verify that the location is acceptable before performing installation and or servicing tasks If you do not understand any portion of the installation or operation procedures please consult Har...

Страница 5: ...to the equipment without written authorization by the manufacturer is prohibited and will void the warranty WARRANTY Please ensure that you advise the owner of the Pinnacle SL600HD stair lift to fill...

Страница 6: ...ation inspect and check the box contents and report any damage or missing items to Harmar CHASSIS BOX CONTENT Chassis Call send parts Two 2 call send hand controls Battery charger Manual override tool...

Страница 7: ...quate space for a landing add 7 to the nose to floor measurement This will provide enough rail length to allow the stair lift to be adjusted so that the floor to seat height will be the same at both t...

Страница 8: ...track containing the splice pins They will each be secured by the joint fasteners 5 16 flathead screws 4 Position the two ends of the rail close together Locate and connect the plug on the ends of th...

Страница 9: ...iser of the first step from the bottom landing The second and third brackets should be placed and tightened on the steps on each side of the rail joint again so the back of the bracket touches the ris...

Страница 10: ...RUSION INSTALLATION 1 Measure A top landing to B bottom landing See Figure 4 12 Figure 4 12 2 7 of overrun should be added for a normal overrun with no obstructions within 3 9 of the nose of the top s...

Страница 11: ...4 15 Figure 4 15 3 Remove the zip tie on the power switch and turn the unit on The unit will beep once indicating it is ready for use 4 Use the installation switch the black switch on the top of the...

Страница 12: ...serted Allen screw with a 5 64 Allen wrench This will be used to set the final upper limit for the stair lift See Figure 4 20 Figure 4 20 4 Remove the charging strips from the rail box Connect the cha...

Страница 13: ...r supply Minimize wire length and intrusion Use care in routing the charger lead If possible secure along or inside wall to avoid the creation of a tripping hazard WARNING FOOTREST AND SEAT INSTALLATI...

Страница 14: ...ure that the seat support is level and tighten the two 2 front and two 2 rear leveling bolts See Figure 4 28 Figure 4 28 9 Connect the footrest cable to the 6 pin connector on the chassis See Figure 4...

Страница 15: ...beep and the LED indicator light on the armrest control should cycle through a test sequence showing red yellow and green respectively If any of the system controls or safety sensors are engaged the...

Страница 16: ...p or Down button on the second remote The second remote is now programmed 8 Upon completion two beeps will indicate that both remotes have been successfully programmed 9 Turn the On Off switch to the...

Страница 17: ...es are located in both the upward and the downward ends of the chassis providing protection from obstructions on the rail 2 Safety stop is located in the footrest providing protection from obstruction...

Страница 18: ...the lift to the bottom keeping the control switch pressed all the time and check that the lift gently decelerates and stop so the footrest pan is clear of the floor If necessary adjust the limit cams...

Страница 19: ...NING If your lift fails to operate and the operator is unable to exit the lift on the stairway another person may use the optional manual override tool to lower or raise the lift to a landing However...

Страница 20: ...1500 Independence Blvd Suite 220 Sarasota FL 34234 800 833 0478 www harmar com...

Отзывы:

Похожие инструкции для PINNACLE SL600HD