Harman PB 105 Скачать руководство пользователя страница 12

12

Chimneys taller than 20’ above the connection will 

require a draft test to determine if the draft is too high.

Note: The High Burn Draft should not exceed  .85 

IWC. Some form of a restrictor plate may be required at 

the top of high chimneys to reduce the draft. See page 

20 for the Draft Test procedure.

Creosote - Formation and Need for Removal -

 When wood is burned slowly, it produces tar and other organic vapors, 

which combine with expelled moisture to form creosote. The creosote vapors condense in the relatively cool chimney flue 

of a slow-burning fire. As a result, creosote  residue accumulates on the flue lining. When ignited, this creosote makes an 

extremely hot fire. The pellet vent pipe should be inspected at least twice monthly during the heating season to determine if 

a creosote buildup has occurred. If creosote has accumulated it should be removed to reduce the risk of a chimney fire.

 

Guidance on minimizing creosote formation and the need for periodic creosote removal: The chimney should be 

inspected during the heating season to determine if a creosote build-up has occurred. If a significant layer of creosote has 

accumulated (3mm or more) it should be removed to reduce the risk of a chimney fire.

The PB105 Boiler may be used and installed into 

an existing masonary or Class A metal chimney.

Certain Canadian and Local Codes may require that 

the chimney be fully relined.

The venting Can Not

 be installed in a chimney 

serving another appliance.

The chimney should be cleaned and or inspected 

before installation of the venting.

venting Installation

NOTE: All installation clearances and restrictions 

must be adhered to.

NOTE:  Read  and  follow  all  of  the  vent  pipe 

manufacturers’  instructions  on  the  proper 

installation and support of the vent pipe. Adhere 

to all clearances.

DO NOT INSTALL A FLUE DAMPER IN THE 

EXHAUST  VENTING  SYSTEM  OF  THIS 

UNIT.

DO  NOT  CONNECT  THIS  UNIT  TO  A 

CHIMNEY  FLUE  SERVING  ANOTHER 

APPLIANCE.

INSTALL VENT WALL PASS-THROUGHS AT 

CLEARANCES  SPECIFIED  BY THE VENT 

MANUFACTURER

INSTALLATION IS TO BE PERFORMED BY 

A QUALIFIED INSTALLER.

NOTE: Use only 4” diameter type “L” or “PL” 

venting system. Be sure to inspect and clean 

exhaust venting system frequently.

KEEP COMBUSTIBLE MATERIALS SUCH 

AS GRASS, LEAVES, ETC. AT LEAST 3 FEET 

AWAY FROM THE POINT DIRECTLY UNDER 

THE VENT TERMINATION. (BETWEEN THE 

VENT AND THE GROUND)

WARNING

KEEP COMBUSTIBLES AWAY 

FROM FLUE OUTLET.

CAUTION 

MOBILE HOME GUIDELINES DO NOT 

ALLOW INSTALLATION IN ANY ROOM 

DESIGNATED FOR SLEEPING.

WARNING

Other examples of possible installations of the venting.

Содержание PB 105

Страница 1: ...INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA Contact your localauthority such as municipal building departm...

Страница 2: ......

Страница 3: ...ture Pressure Gauge Pressure Relief Valve Aquastat Well 1 1 4 FMPT Supply 1 1 4 FMPT Return Ash Door Firebox Door Access Cover To Hopper Swing Plate Knob Access Cover To Secondary Ash Chamber Blank Co...

Страница 4: ...st Options 36 Warranty 37 Testing Label 38 Quick Reference Start Up Back Cover Please read this entire manual before you install and use your new boiler Failure to follow instructions may result in pr...

Страница 5: ...Assembly Outdoor Air Temperature Sensor Wiring...

Страница 6: ...lock washers provided to the studs by removing the access cover on the secondary ash chamber Step 2 Place the combustion motor onto the flue tunnel weldment and tighten the 3 wing screws provided Step...

Страница 7: ...ds before connections are made 4 Install 3 4 MPT pressure relief valve as shown 5 Install the 1 2 MPT aquastat well in fitting as shown then place aquastat in the well and fasten with a zip tie 6 Inst...

Страница 8: ...e L or PL venting system Be sure to inspect and clean exhaust venting system frequently When installing the PB105 in a mobile home several requirements must be followed 1 The unit must be bolted to th...

Страница 9: ...sembly when mea sured from the horizontal center line of the regulator 1 I The clearance to service regulator vent outlet must be a minimum of 6 feet 1 J The clearance to a non mechanical air supply i...

Страница 10: ...10 Venting Fig 3...

Страница 11: ...Fig 5 Venting Use 4 pellet vent pipe to vent your PB105 A combustion blower is used to extract the combustion gases from the firebox This creates a negative pressure in the firebox and a positive pre...

Страница 12: ...e removed to reduce the risk of a chimney fire The PB105 Boiler may be used and installed into an existing masonary or Class A metal chimney Certain Canadian and Local Codes may require that the chimn...

Страница 13: ...t is located on the face of the Feeder Cover It is pre cut except for several small tabs There is also a filler plate screwed to the inside to cover the top of the hole after the Outside Air Pipe has...

Страница 14: ...tected with an in line fuse rated at 6 AMP This boiler should never be powered by the use of an extension cord The recommended high and low voltages are 130 V A C 60 Hz maximum high voltage and 113 V...

Страница 15: ...15 Installing Duct Installation...

Страница 16: ...uel to the other without requiring the manual adjustment of any controls or components other than the thermostats 4 Be compatible with the operation of a service water heating coil within the original...

Страница 17: ...17 Installation A...

Страница 18: ...18 Installation...

Страница 19: ...19 Installation...

Страница 20: ...25 35 IWC Depending on the amount of vertical rise it may not be possible to get a low draft reading in this range In this case a maximum low draft of 55 is acceptable The adjustment screw is through...

Страница 21: ...maximum feed rate Test Combustion blower feed motor and safety dump zone are fully energized for the first minute Combustion blower alternates from high to low every minute Overheat Saftey Zone Light...

Страница 22: ...ondensation in the secondary ash chamber area and also in the venting system both of which could cause damage in these areas NOTE If the system is run at the lower temperature settings con ditions of...

Страница 23: ...t 185 o 65 o 140 o 45 Min set at 140 o 60 o 145 o 40 55 o 150 o 35 50 o 155 o 30 45 o 160 o 25 o 40 o 165 o 20 o 35 o 170 o 15 o 30 o 175 o 10 o 25 o 180 o 5 o 20 o 185 o 0 o 15 o 185 o 0 o 10 o 185 o...

Страница 24: ...s will be pushed out by the feeder NOTE To minimize the amount of stress placed on the hopper swing plate hinges opening of the hopper swing plate should be done with the least amount of fuel in the h...

Страница 25: ...desired After you know a feed rate setting that works well for your application use that setting NOTE You know your feed rate is too high when The overheat safety feature is energized each time the h...

Страница 26: ...n the appliance installationclearances orwithinthespacerequiredfor fueling ash removal and other routine maintenance operations Operation Lighting A Fire Manually Lighting the fire manually will not b...

Страница 27: ...EP ALL SUCH LIQUIDS WELL AWAY FROM THE FURNACE WHILE IN USE Fig 15 11 Apply starting gel as shown in Fig 15 12 Light The Starting Gel With A Match 13 Close The Doors The fire will light and the PB105...

Страница 28: ...excessive buildup is noticed during scheduled cleanings There is a cover on the front of the burnpot to gain access to the air chamber and igniter The cover is held into place by two thumb screws Loo...

Страница 29: ...yash Formation and Need for Removal The products of combustion will contain small particles of flyash The flyash will collect in the exhaust venting system and restrict the flow of the flue gases Inco...

Страница 30: ...burnpot and fines cleanout area Be careful not to damage the igniter located inside the burnpot Open firebox door and vaccum ash from ledges and ash deflector You can also clean the firebox door view...

Страница 31: ...hole that goes up into the flue pipe See Fig 24 NOTE The ESP probe sensing tip extends into this same area CARE MUST BE TAKEN NOT TO DAMAGE THE ESP PROBE DURING CLEANING Bending of the ESPprobe will m...

Страница 32: ...e FIRE HAS GONE OUT 1 No pellets in hopper 2 Draft setting is too low 3 Something is restricting fuel flow 4 Feed motor or combustion blower has failed 5 Power failure or blown fuse SMOKE IS VISIBLE C...

Страница 33: ...TAINER UL FEEDER GEARMOTOR BRACKET REV A PB 105 PF100 ULFEEDER PUSHER ARM WELDMENT 105X6 PELLET AIR INTAKE ASSY HIGH BTU SLIDE PLATE ASSY ULFEEDER CAM BLOCK LONG ASSY FHN 5 16 18 5 16 18 WING NUT FHN...

Страница 34: ...U if system is satisfied Min Burn 1 1 pound per hour Max Burn 13 4 pounds per hour 8500 BTU per pound figures Electrical 120 VAC 60 Hz Combustion blower 1 4 AMP Auger motor 7 AMP Igniter element 2 3 A...

Страница 35: ...35 Wiring Diagram Wiring Diagram...

Страница 36: ...TENSION 3 20 00844 ESP PROBE Red wires 3 20 00744 Black wires 3 20 02583 2 PAIR TWISTED CAT 3 CABLE 100 FT 3 20 06143 CIRCUIT BOARD 3 20 09302 FEED MOTOR 6 RPM 3 20 09302B FEED MOTOR FAN BLADE 3 20 68...

Страница 37: ...red Damage and or repairs including but not limited to remote controls filters fuses knobs glass ceramic brick panels ceramic fiber afterburners combustion packages door packing tile ceramic log sets...

Страница 38: ...Testing Label 38...

Страница 39: ...NOTES 39...

Страница 40: ...rn Feed Adjuster back to the 4 setting 8 Turn the MAX TEMP dial to the desired temperature 9 Turn MIN TEMP dial to the desired settings 10 Flip the igniter switch to Auto The boiler will ignite if the...

Отзывы: