3 feet (0.9m) above the point at which they exit 

from the roof, it must also extend 2 feet (0.6m) 

above the highest point within a 10 ft. (3m) radius.

DO NOT CONNECT THIS uNIT TO A CHImNEy 

fLuE THAT IS SErVING ANOTHEr AppLIANCE.

 

Limit connector pipe to 8 ft. or less, with 

no more than two elbows. All horizontal sections 

should have 1/4 in. rise per foot. The chimney 

must be capable of providing a draft reading of at 

least .06 in. of water column. A barometric damper 

can be installed to prevent excessive and erratic 

draft. All connector pipe should be secured with 

sheet metal screws at each joint.

Installation

plumbing

 

The Harman Trident Boiler can be used as 

a “Stand Alone” boiler or as an add-on to an exist-

ing hot water heating system.

 

The diagrams in this manual are meant to 

show the necessary equipment and piping. Your 

system may look very different. However, if config-

ured properly, the same results will be achieved. 

 

Fig. 6 shows a typical plumbing diagram 

for tying into an existing system. This method 

provides water circulation between the two boilers 

with a circulating pump. In this setup, the domes-

tic water coil in the existing boiler will be heated, 

making it unnecessary to install a water coil in the 

Trident Boiler. 

 

Tying-in to an existing boiler must be done 

in the return line between the circulator and the 

existing boiler. Run a pipe from there to a small 

circulator, and then into the 1-1/4 in. fitting on the 

rear of the Trident Boiler. Next run a pipe from the 

1-1/4 in. fitting on the top of the Trident Boiler to a 

Tee fitting in the supply line of the existing boiler. 

This Tee fitting must be installed between the ex-

isting boiler and the Flow Control Valve, as shown 

in Fig. 6. An air valve should be installed on this 

line also.

FIG.

FIG.

Air Valve

Notice:

The Aquastat controls supplied with 

the Trident Boiler are designed only 

to maintain water temperature within 

the boiler. The actual heating sys-

tem is controlled separately by your 

thermostat(s) opening zone valves or 

energizing circulation pump(s).

Do not attach a thermostat to the sup-

plied controls. 

Содержание SF160

Страница 1: ...OPERLY INSTALLED A HOUSE FIRE MAY RESULT FOR YOUR SAFETY FOLLOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA Contact your local authority such as municipal building department fire department fire prevention bureau etc to determine the need for a per mit Cette guide d utilisation est disponible en francais...

Страница 2: ... ...

Страница 3: ... Company recommends that the installation be performed by a plumbing and heating expert The Harman Trident Boilers are designed to operate safe easy and automatically You may however need to learn a few basic skills to maintain a fire Especially if this is your first venture into solid fuel burning If you have any problems re read these instructions If you can not resolve the issue s Contact your ...

Страница 4: ...elief Valve 30 psi Temperature Pressure Gauge Automatic Draft Control Assembly 1 pc Flex Conduit w 2 90 Fittings w nuts and 3 Chase Nipples w nuts 2 Manual Draft Control Knob Assembly 3 Brass Coil Spring Handle Ash Pan Warranty Registration Form Notice The Aquastat controls supplied with the Trident Boiler are designed only to maintain water temperature within the boiler The actual heating sys tem...

Страница 5: ... the boiler using the 2 5 16 X 3 4 in bolts and lock washers Assembly Install the Temperature Pressure Gauge into the pipe stub in the center of the round plate on the front of the boiler FIG 1 Install the A350 sensor wire all the way into the immersion well and screw the well into one of the top holes on the face of the boiler Turn the pressure relief valve into the stub on top of the boiler next...

Страница 6: ... the din rail on a flat surface with the flat side down Secure one end clamp on the left side Slide the A350 controller onto the rail from right to left until it is against the end clamp Slide the Y350 onto the rail and guide the plug in connector joining it to the A350 Next install the S350 again guiding the plug in connector carefully Install the other end clamp to the right side of the din rail...

Страница 7: ...rheat dump would stop With the differen tial set at 15 using the temperatures above the circuit would re open stopping the overheat dump at a water temperature of 185 The 120V wiring is attached on the normally open and the common position The normally closed position is not used Re install the covers onto the three Con trols Optional Items There is a domestic hot water coil available for your Tri...

Страница 8: ...l plumbing diagram for tying into an existing system This method provides water circulation between the two boilers with a circulating pump In this setup the domes tic water coil in the existing boiler will be heated making it unnecessary to install a water coil in the Trident Boiler Tying in to an existing boiler must be done in the return line between the circulator and the existing boiler Run a...

Страница 9: ...trol whether open to increase heat or closed to decrease heat The S350 is used as overheat protection Since a wood or coal fire is still producing heat when the draft is closed this overheat protection is required You could have the S350 energize a circulating pump or a zone valve separate from the heating system or it could be hooked up so that it flows the heated water throughout the system Eith...

Страница 10: ...top of the newspaper Be sure this kindling is dry and no more than 3 4 in in diameter Layer the kindling in a criss cross type pattern to allow maximum air flow Next lay some larger pieces of wood on top of the kindling approximately 2 in diameter Using a match or lighter light the paper just inside the door Close and latch the firebox door and al low the fire to burn a few minutes After about fiv...

Страница 11: ...1 complete turn from closed Adjust both controls equally Loading Coal should never be added unless there is a reasonably hot fire The coal bed should be bright and vigorous If you have an active coal bed full loads can be added at any time If not add new coal in layers as described in starting a coal fire Shaking the Grates Shaking should be done only when there is a well established fire The freq...

Страница 12: ...g the first few hours of burning a blue smoke may be observed rising from the boiler This is the paint going through the curing process It is advisable to increase the amount of fresh air in the room during this break in period This can be achieved by opening doors and windows Don t be alarmed this is normal and will only last a short while Chimney Problems Not Enough Draft Chimney is too low The ...

Страница 13: ...available for replacement from your Harman dealer Gaskets on the doors are there to regulate air to the firebox If a gasket is failing you ll notice difficulty in controlling the fire Inspect the gaskets regularly and replace with Harman supplied mate rial only Specifications SF 160 SF 260 SF 360 Heating Capacity Square Feet 2200 Max 3200 Max 4500 Max Approximate BTU per hour wood or coal 90 000 1...

Страница 14: ...his warranty shall be made to the dealer from whom this appliance was purchased Then contact is made with the manufacturer giving the model serial number date of pur chase dealer s name and address plus a simple explanation of the nature of the defect SHIPPING COSTS The transportation charges are as follows 1 Customer Pre pays freight to Harman Stove Company 2 Harman Stove Company Pre pays charges...

Отзывы: