background image

Congratulations,

 

 

You have just purchased the finest wood / coal boiler available. Harman Trident boilers are 

constructed of high quality materials and are manufactured by a highly skilled team of assemblymen. 

Each boiler is inspected and pressure tested for quality assurance.

 

This manual is designed to provide all of the basic information needed for a safe and proper 

installation. However, there are many skills needed that can not be learned by reading this manual. 

Harman Stove Company recommends that the installation be performed by a plumbing and heating 

expert.

 

The Harman Trident Boilers are designed to operate safe, easy and automatically. You may 

however, need to learn a few basic skills to maintain a fire. Especially if this is your first venture into 

solid fuel burning. If you have any problems, re-read these instructions. If you can not resolve the 

issue(s), Contact your Harman Stove dealer. 

TABLE OF CONTENTS

Packing List

Installation

 

Aquastat

 

Wiring

 

Venting

 

Plumbing

Operating Instructions

 

Starting a Wood Fire

 

Starting a Coal Fire

 

Loading Fuel

 

Shaking Ashes

Safety Tips

Maintenance

Specifications

Warranty

4

5

6

7

7

8

10

10

11

11

11

12

13

13

14

Содержание SF160

Страница 1: ...OPERLY INSTALLED A HOUSE FIRE MAY RESULT FOR YOUR SAFETY FOLLOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA Contact your local authority such as municipal building department fire department fire prevention bureau etc to determine the need for a per mit Cette guide d utilisation est disponible en francais...

Страница 2: ... ...

Страница 3: ... Company recommends that the installation be performed by a plumbing and heating expert The Harman Trident Boilers are designed to operate safe easy and automatically You may however need to learn a few basic skills to maintain a fire Especially if this is your first venture into solid fuel burning If you have any problems re read these instructions If you can not resolve the issue s Contact your ...

Страница 4: ...elief Valve 30 psi Temperature Pressure Gauge Automatic Draft Control Assembly 1 pc Flex Conduit w 2 90 Fittings w nuts and 3 Chase Nipples w nuts 2 Manual Draft Control Knob Assembly 3 Brass Coil Spring Handle Ash Pan Warranty Registration Form Notice The Aquastat controls supplied with the Trident Boiler are designed only to maintain water temperature within the boiler The actual heating sys tem...

Страница 5: ... the boiler using the 2 5 16 X 3 4 in bolts and lock washers Assembly Install the Temperature Pressure Gauge into the pipe stub in the center of the round plate on the front of the boiler FIG 1 Install the A350 sensor wire all the way into the immersion well and screw the well into one of the top holes on the face of the boiler Turn the pressure relief valve into the stub on top of the boiler next...

Страница 6: ... the din rail on a flat surface with the flat side down Secure one end clamp on the left side Slide the A350 controller onto the rail from right to left until it is against the end clamp Slide the Y350 onto the rail and guide the plug in connector joining it to the A350 Next install the S350 again guiding the plug in connector carefully Install the other end clamp to the right side of the din rail...

Страница 7: ...rheat dump would stop With the differen tial set at 15 using the temperatures above the circuit would re open stopping the overheat dump at a water temperature of 185 The 120V wiring is attached on the normally open and the common position The normally closed position is not used Re install the covers onto the three Con trols Optional Items There is a domestic hot water coil available for your Tri...

Страница 8: ...l plumbing diagram for tying into an existing system This method provides water circulation between the two boilers with a circulating pump In this setup the domes tic water coil in the existing boiler will be heated making it unnecessary to install a water coil in the Trident Boiler Tying in to an existing boiler must be done in the return line between the circulator and the existing boiler Run a...

Страница 9: ...trol whether open to increase heat or closed to decrease heat The S350 is used as overheat protection Since a wood or coal fire is still producing heat when the draft is closed this overheat protection is required You could have the S350 energize a circulating pump or a zone valve separate from the heating system or it could be hooked up so that it flows the heated water throughout the system Eith...

Страница 10: ...top of the newspaper Be sure this kindling is dry and no more than 3 4 in in diameter Layer the kindling in a criss cross type pattern to allow maximum air flow Next lay some larger pieces of wood on top of the kindling approximately 2 in diameter Using a match or lighter light the paper just inside the door Close and latch the firebox door and al low the fire to burn a few minutes After about fiv...

Страница 11: ...1 complete turn from closed Adjust both controls equally Loading Coal should never be added unless there is a reasonably hot fire The coal bed should be bright and vigorous If you have an active coal bed full loads can be added at any time If not add new coal in layers as described in starting a coal fire Shaking the Grates Shaking should be done only when there is a well established fire The freq...

Страница 12: ...g the first few hours of burning a blue smoke may be observed rising from the boiler This is the paint going through the curing process It is advisable to increase the amount of fresh air in the room during this break in period This can be achieved by opening doors and windows Don t be alarmed this is normal and will only last a short while Chimney Problems Not Enough Draft Chimney is too low The ...

Страница 13: ...available for replacement from your Harman dealer Gaskets on the doors are there to regulate air to the firebox If a gasket is failing you ll notice difficulty in controlling the fire Inspect the gaskets regularly and replace with Harman supplied mate rial only Specifications SF 160 SF 260 SF 360 Heating Capacity Square Feet 2200 Max 3200 Max 4500 Max Approximate BTU per hour wood or coal 90 000 1...

Страница 14: ...his warranty shall be made to the dealer from whom this appliance was purchased Then contact is made with the manufacturer giving the model serial number date of pur chase dealer s name and address plus a simple explanation of the nature of the defect SHIPPING COSTS The transportation charges are as follows 1 Customer Pre pays freight to Harman Stove Company 2 Harman Stove Company Pre pays charges...

Отзывы: