7
P61A Pellet Stove
installing
Place the stove on a noncombustible floor or on a floor
protector that extends a minimum of 6 inches to the front,
(measured from the glass) 6 inches to the sides and 1 inch to
the rear of the hopper. It is also recommended that floor protec-
tion be installed under any horizontal venting and extending 2
inches beyond the vent measurement. Material used for floor
protection must have a k-factor of 2.2 or lower. Example: 1"
thickness of Durock® is rated at 1.92 k per inch, which would
meet the requirement.
Place the stove away from combustible walls at least as far
as shown in Figures , and 5. Note the difference in side wall
clearance with and without side shields.
Note that the clearances shown are minimum for safety
but do not leave much room for access when cleaning or
servicing.
Connect the power cord to a 120 V.A.C. 60Hz grounded
receptacle. (A surge protector is recommended to protect the
circuit board.) Also be sure that the polarity of the outlet that
the stove is plugged into is correct.
Prior to installing the flue pipe, connect a draft meter. (The
draft meter must have a minimum range of 0-.5.) Record the
first reading. Connect flue pipe to stove and be sure all doors
and windows in the home are closed. Record the second
draft reading_______. If the second reading is more than .05"
lower than the first reading, check for possible restrictions or
the need for outside air (see page 9). For more information
on the draft test procedure, refer to Page 21.
Mobile home installation
When installing this unit in a mobile home, several require-
ments must be followed:
1. The unit must be bolted to the floor. This can be done with
1/" lag screws through the 2 holes in the base plate.
2. The unit must also be connected to outside air. See page
9.
. Floor protection and clearances must be followed as
shown.
. Unit must be grounded to the metal frame of the mobile
home.
cAutiOn: this appliance must be vented to the outside.
installation
MObile/MAnuFActuRed hOMe
StAndARdS dO nOt AllOw
inStAllAtiOn in ROOMS deSignAted
FOR SleePing.
wARning
the StRuctuRAl integRitY OF the
MAnuFActuRed hOMe FlOOR,wAll, And
ceiling/ROOF MuSt be MAintAined.
wARning
Fig. 4
9" With Side Shields
13" Without Side Shields
Fig. 3
9" or 13"
9" or 13"
Fig. 6
Fig. 5
18"
Floor Protection must meet a minimum
2.24k value or lower. (
The lower the k
value, the better the protection.
)
Содержание P61A
Страница 2: ......
Страница 29: ...29 P61A Pellet Stove This page intentionally left blank...
Страница 32: ...32 P61A Pellet Stove...
Страница 33: ...33 P61A Pellet Stove...
Страница 39: ...39 P61A Pellet Stove Service Maintenance Log Date Of Service Performed By Description Of Service...
Страница 40: ...Proudly Printed On 100 Recycled Paper...