![Harman Home Heating P61A Скачать руководство пользователя страница 14](http://html2.mh-extra.com/html/harman-home-heating/p61a/p61a_installation-and-operating-manual_3937106014.webp)
1
P61A Pellet Stove
#8 installing through the ceiling
Through the ceiling vent, follow PL vent
manufacturers recommendations when using wall
and ceiling pass through.
note: do not place joints
within wall pass-throughs.
Fig. 14
PL vent manufacturer's
firestop spacer and
support
(See Page 7 for
corner installation
clearances)
Minimum flue vent
configuration
It is recommended that outside
air be installed with this venting
configuration to reduce smoke
and creosote smell in the room
in the event of power failure.
Min. above ground level
18"
Storm collar
Flashing
" min.
" min.
12" min.
" min.
venting
Fig. 15
" min.
No insulation or
other combustible
m a t e r i a l s a r e
a l l o w e d w i t h i n
3" of the pellet
vent pipe. Unless
specified by the
pipe manufacturer
12" min. wall to outlet
36" min clearance to any
combustible material
Fig. 16
Содержание P61A
Страница 2: ......
Страница 29: ...29 P61A Pellet Stove This page intentionally left blank...
Страница 32: ...32 P61A Pellet Stove...
Страница 33: ...33 P61A Pellet Stove...
Страница 39: ...39 P61A Pellet Stove Service Maintenance Log Date Of Service Performed By Description Of Service...
Страница 40: ...Proudly Printed On 100 Recycled Paper...