- 17
7 | Installation / Rigging
Installing the Rope
(1) Open the Side Plate by activating the Side Plate Release Latch 2 times.
(2) Move the Control Handle to the Stand By position.
(3) Load the rope according to the diagram marked on the device.
(4) Close the Side Plate and secure the device to an appropriate attachment point or anchor with a locking connector.
Loading the rope incorrectly could cause imminent risk of injury or death.
Usage on Anchor
In tight clearance or overhead rigging solutions an extra carabiner is recommended to improve ergonomics, redirect the rope
and/or improve alignment of rope into the device. An extra carabiner may also be used to increase friction on the free end of the
rope for heavy load applications.
2x
!
Содержание CMC CLUTCH
Страница 4: ...1 Traceability Markings I L B D C G H A J K E F M ...
Страница 11: ... 11 4 Inspection Points to Verify Wear Indicator x3 Wear Indicator ...
Страница 22: ...10 Precautions for Use 22 ...
Страница 23: ... 23 11 EN 12841 C 5 6 7 8 DESCENT SPEED 30 200 kg 2 m s MAX 200 240 kg 0 5 m s MAX 1 2 ...
Страница 26: ... 26 12 EN 341 2A ...
Страница 28: ... 28 12 EN 341 2A 230kg ...