
Reflex furler
15
Commissioning
Loading line
Work the line into the space between the
drive sheave and the flexible cowling.
Make sure the torsion cable is not attached
to the drive unit. Load the looped furling
line into the line guard.
Rotate the drive sheave as you press the
line into position around the drive sheave.
Load the final part by pulling the line from
outside the drive unit.