Hardlife Utility C4040 Скачать руководство пользователя страница 3

 

Parts List 

Part Code 

Description 

Qty 

1

 

Base Plate for endwall door 

2

 

2

 

Base plate at both site 

4

 

3

 

Extension Leg for High Qube Container 

6

 

4

 

Lower standing leg 

6

 

5

 

Middle standing leg 

4

 

6

 

Upper standing leg for the door 

2

 

7

 

Middle standing leg for the door 

2

 

8

 

Upper standing leg for both side 

2

 

9

 

Lower horizontal tube 

6

 

10

 

Upper horizontal tube 

2

 

11

 

door beam 

1 group

 

12

 

vertical supporting tube 

1

 

13

 

diagonal bracing tube 

1

 

14

 

bottom tension tube 

4

 

15

 

Back endwall fabric 

16

 

Rope 

1 dozen 

17

 

Bolts M10*60 

5

 

18

 

Carriage Bolts M10*90 

54

 

19

 

Carriage Bolts 

φ

12*110

 

10

 

20

 

Clips

φ

76 

10

 

21

 

Stake Peg 

12

 

22

 

Two-place angle seat 

1

 

23

 

Φ

60 Clip 

1

 

25 

Wheels for pull door

 

1 set 

26 

Rope for pull door

 

 
 
 
 

Содержание C4040

Страница 1: ...1 SHELTER ASSEMBLY MANUAL Model W12xL12xH 4 5m C4040 Back wall frame of Container Shelter C4040 Back wall frame ...

Страница 2: ...ibility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery places in high winds or wet location 2 Keep children away All children should be kept away from the work area 3 Don t over reach Keep proper footing and balance at all times 4 Do not assemble in under ...

Страница 3: ...for the door 2 8 Upper standing leg for both side 2 9 Lower horizontal tube 6 10 Upper horizontal tube 2 11 door beam 1 group 12 vertical supporting tube 1 13 diagonal bracing tube 1 14 bottom tension tube 4 15 Back endwall fabric 1 16 Rope 1 dozen 17 Bolts M10 60 5 18 Carriage Bolts M10 90 54 19 Carriage Bolts φ12 110 10 20 Clipsφ76 10 21 Stake Peg 12 22 Two place angle seat 1 23 Φ60 Clip 1 25 Wh...

Страница 4: ...TION PROCESS A FRAME INSTALLATION Figure 1 There are four base plate comes with the back endwall Each of them should be placed in the right position especially the two base plate close to the containers 1 The measure is from center to center of the tubes Referring to the above diagram 2 As the Figure 2 Shows please find all the parts accordingly ...

Страница 5: ...s Part No 20 Part No 23 and bolts C INSTRUCTION FOR COVER ATTACHED Assembly the end cover first NOTE DO NOT install the cover onto the frame of your building in high wind conditions A slight breeze is the most advantageous for cover installation To take advantage of the breeze pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air Figure 2 ...

Страница 6: ... 16 to tie the end cover No 15 to the end wall 2 Use rope NO 26 to tie the Wheels No 25 to pull door The process is quite easy But some tightening adjustments will be necessary to produce a flat Please adjust the cover timely ...

Страница 7: ...tom to the top then go through the pulley on the left from outside then lead the rope from left pulley to the right upper pulley The rope for the right tie the rope down on the endwall arch first Then lead the rope to the bottom of the door cover from inside then lead the rope from bottom to the top then go through the lower pulley on the right from outside ...

Страница 8: ...4 ...

Отзывы: