A--EQUIPEMNTAND TOOLS FOR INSTALIATION

1. Measuring tape
2. String for alignment
3. Step ladder
4. Welder
5. Sledge hammer
6. Wrench
7. Scissors

INSTALLATION PROCESS
A—BASE INSTALLATION

Please refer to the diagram (Figure 1) to place the base plates.

Above is base plates lay out for C2020H

Содержание C2020H

Страница 1: ...SHELTER ASSEMBLY MANUAL Model C2020H W6x L6x H 2m Model C2040H W6x L12x H 2m Container Shelter ...

Страница 2: ...urlin 4 8 6 Connection purlin 16 32 7 φ25mm Lower tensioning tube for roof cover 2 Groups 2 Groups 8 Angle seat for roof cover 4 4 9 Roof cover 1 1 10 φ25mm Plastic Plug 4 4 11 Ropes 1 Bundle 1 Bundle 13 Bolt M8x70 80 144 14 Butterfly bolt 8 16 14A Rachet Straps 10 18 14B 1 5 Rachet With Screws 10 18 16 Tube for connecting cover 4 4 17 Angle seat 6 6 18 Ratchet tie down 2 2 19 Iron plate 2 2 20 Bo...

Страница 3: ... the owners responsibility to take of snow immediately if not slide off by itself READALL INSTRUCTIONS BEFOREASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery places in high winds or wet location 2 Keep children away All children should be kept away from the work area 3 Don t over reach Keep proper footing and balance at all times 4 Do not a...

Страница 4: ... Measuring tape 2 String for alignment 3 Step ladder 4 Welder 5 Sledge hammer 6 Wrench 7 Scissors INSTALLATION PROCESS A BASE INSTALLATION Please refer to the diagram Figure 1 to place the base plates Above is base plates lay out for C2020H ...

Страница 5: ... Figure 1 1 The measure is from center to center of the tubes Referring to the above diagram and confirm the place of the base plates ENSURE THAT THE FOUNDATIONS IS SQUARE 2 All the base plates need use welder to be welded on the Containers ...

Страница 6: ...Above is Frame for C2020H Below is Frame for C2040H ...

Страница 7: ...truss where the fabric will rest 2 Lift an assembled arch into one base plate and force the other end of the arch into the opposite base plate 3 When finishing installing the first two arches connect the Connection purlin onto them by using screw M8x70 part code 13 There is 4 pieces of Connection purlins part code 6 and 1 piece of Top roof purlin part code 5 between each arch Then install the thir...

Страница 8: ... NOT install the cover onto the frame of your building in high wind conditions A slight breeze is the most advantageous for cover installation To take advantage of the breeze pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air ...

Страница 9: ...Figure 3 ...

Страница 10: ...t the front back ends of the cover to the end arches 3 Cut pockets above the rachet No 14B according to the position of the base plates and put the Lower Tension tubes for roof cover part code 7 into the pocket of roof cover Then use the Rachet Straps part code14A to tie down the Lower tension tubes like the Figure 3 Finally install the 25mm Plastic plug for base rail section part code 10 into two...

Страница 11: ...Install the End Cover Find out the spare parts according to above drawing fix the end cover in the back of the shelter ...