8
ASSEMBLY INSTRUCTIONS
(Continued)
4.
Route wires through motor coupling cover
(G), canopy screw cover (F) and ceiling
canopy (E). (Fig. 4)
5.
Reinstall the hanger ball on the
downrod/hanger ball assembly (D) by routing
the three 54 in. wires through the hanger ball.
Position the pin from the downrod/hanger
ball assembly (D) through the two holes in
the downrod and align the hanger ball so
the pin is captured in the groove in the top of
the hanger ball. Pull the hanger ball up tight
against the pin. Securely tighten the set screw
in the hanger ball. (Fig. 5)
6.
Cut off excess lead wire approximately 6 to 9
in. above top of the top of the downrod/hanger
ball assembly (D). Strip insulation off 1/2 in.
from the end of each lead wire. (Fig. 6)
4
F
E
D
D
G
5
6
6 to 9 in
.
CAUTION
A loose set screw could result in a wobbly
fan.