5
4、
INSTALLING&CONNECTION
4.1 Operate situation
Welding machine must put on flat
、
cleaning and dry ground .Forbid to put the welding
machine on following situation:
a.Under hard sunshine and raining place.
b.With dusty and combustible gas place .
c.With harmful or caustic gas place.
d.With high temperature and steam place
e.Vibration and collision place.
f.The distance between other circumambience smaller than 50cm.
g.The temperature higher than +40
℃
or less than -10
℃
..
4.2 Ground connecting
Connect the machine’s ground connecting port to power’s ground connecting port and avoid
damaged by electric shock.
4.3 Ventilation
To assure welding quality must reduce the wind influence.If operate in seal space should
supply aeration equipmennt and avoid lack of oxygen.
4.4 Power and line
Table2
、
power and line
(
only for reference
)
Model
HP80
HP120
HP200
Input power
3-Phase
,
AC 380V/ 50Hz
Capacity
Power
Above 14KVA
Above 26KVA
Above 26KVA
Engine
Two times than
14KVA
Two times than
26KVA
Two times than
26KVA
Input
protect
equipment
Fuse
30A
55A
55A
Leak
electricity
safeguard
machine
30A
55A
55A
Input cable(mm2)
≥6 mm2
≥10 mm2
≥10 mm2
Output cable(mm2)
≥16 mm2
≥25 mm2
≥25 mm2
Ground cable(mm2)
≥14 mm2
≥14 mm2
≥14 mm2