Hans Grohe Ecostat 1001 SL Care 13284000 Скачать руководство пользователя страница 10

10

11

In-service tests

Purpose

The purpose of in-service tests is to regularly monitor 

and  record  the  performance  of  the  thermostatic 

mixing  valve.  Deterioration  in  performance  can 

indicate the need for service work on the valve and 

/ or the water supplies.

Procedure

1.

Carry out the procedure 

2.

 (a) to (c) on page 

10  using  the  same  measuring  equipment,  or 

equipment to the same specifications.

2.

If  the  mixed  water  temperature  has  changed 

significantly from the previous test results (e.g. > 

1 K), record the change and before re-adjusting 

the mixed water temperature check:

a)   that  any  in-line  or  integral  strainers  are 

clean

b)   any in-line or integral check valves or other 

anti-backsiphonage  devices  are  in  good 

working order

c)   any isolating valves are fully open

3.

With  an  acceptable  mixed  water  temperature, 

complete the procedure 

2.

 (a) to (c) on page 9.

4.

If at step 

2.

 (e) on page 10 the final mixed water 

temperature is greater than the values in Table 

A and / or the maximum temperature exceeds 

the corresponding value from the previous test 

results by more than about 2 K, the need for 

service work is indicated.

     NOTE: In-service tests should be carried out with 

a frequency which identifies a need for service 

work before an unsafe water temperature can 

result. In the absence of any other instruction 

or  guidance,  the  procedure  described  in 

„Frequency of in-service tests“ may be used.

Frequency  of  in-service  tests 

TMV3*

General 

In the absence of any other instruction or guidance on 

the means of determining the appropriate frequency 

of  in-service  testing,  the  following  procedure  may 

be used:

1.

6 to 8 weeks after commissioning carry out the 

tests given in 

2.

 on page 9.

2.

12 to 15 weeks after commissioning carry out 

the tests given in 

2.

 on page 9.

3.

Depending on the results of 

1.

 and 

4.

 several 

possibilities exist:

a)   If  no  significant  changes  (e.g.  <

 

1  K)  in 

mixed  water  temperatures  are  recorded 

between commissioning and 

1.

, or between 

commissioning and 

4.

 the next in-service test 

can  be  deferred  to  24  to  28  weeks  after 

commissioning.

b)   If  small  changes  (e.g.  1  to  2  K)  in  mixed 

water temperatures are recorded in only one 

of these periods, necessitating adjustment of 

the mixed water temperature, then the next 

in-service test can be deferred to 24 to 28 

weeks after commissioning.

c)   If  small  changes  (e.g.  1  to  2  K)  in  mixed 

water temperatures are recorded in both of 

these  periods,  necessitating  adjustment  of 

the mixed water temperature, then the next 

in-service test should be carried out at 18 to 

21 weeks after commissioning.

d)   If significant changes (e.g. > 2 K) in mixed 

water  temperatures  are  recorded  in  either 

of these periods, necessitating service work, 

then the next in-service test should be carried 

out at 18 to 21 weeks after commissioning.

4.

The general principle to be observed after the first 

2 or 3 in-service tests is that the intervals of future 

tests should be set to those which previous tests 

have shown can be achieved with no more than 

a small change in mixed water temperature.

*TMV2: The frequency of performing the in-service 

tests is 1 year maximum.

Содержание Ecostat 1001 SL Care 13284000

Страница 1: ...Installation Instructions Ecostat 1001 SL Care 13282000 Ecostat 1001 SL Care 13284000...

Страница 2: ...e tests 10 Frequency of in service tests 10 Thermostatic Adjustement Temperature Limitation 11 Operating your Shower 12 Cleaning 13 Spare Parts 14 15 Trouble Shooting 16 The Ecostat 1001 SL Care 13284...

Страница 3: ...ustry Approved Plumber Scheme WIAPS Dispose of plastic bags carefully Keep children well away from the work area Check for hidden pipes and cables in the wall before drilling holes The unit must be mo...

Страница 4: ...ith the following Ecostat 1001 SL Care 13282000 1 Ecostat 1001 SL 3 Escutcheons 2 Mesh washers 4 S unions 1 2 3 4 Ecostat 1001 SL Care 13282000 Ecostat 1001 SL Care 13284000 1 Ecostat 1001 SL 3 Escutc...

Страница 5: ...emperature C 52 to 65 52 to 65 Cold supply temperature C 5 to 20 5 to 20 Mixed water temperature Application Mixed water temperature at point of discharge Bidet 38 C max Shower 41 C max Washbasin 41 C...

Страница 6: ...int 1 0 10 bar Unvented System pressure balanced 1 0 10 bar Pumped System 1 0 10 bar IMPORTANT If you install this mixer with a gravity fed system there must be a minimum head vertical distance from t...

Страница 7: ...7 Unvented System pressure balanced Pumped System...

Страница 8: ...tape round the S unions and screw into the backplate elbows The S unions must protrude beyond the tiled surface between 32 and 41mm figs 2 3 4 Seal the gap between the S unions and the tiles fig 3 5...

Страница 9: ...e mixed water in accordance with the manufacturer s instructions and the requirement of the application and then carry out the following sequence a record the temperature of the hot and cold water sup...

Страница 10: ...nce of any other instruction or guidance on the means of determining the appropriate frequency of in service testing the following procedure may be used 1 6 to 8 weeks after commissioning carry out th...

Страница 11: ...he spindle and slide off the locking ring fig 1 2 Turn the spindle until the required maximum temperature is reached 43 C You will need to use a thermometer fig 2 3 Replace the locking ring back onto...

Страница 12: ...1001 SL Care Flow ON OFF Control Shower Turn the flow control handle fig 2a anti clockwise to turn the water on and to increase the flow for the shower outlet Turn it clockwise to decrease the flow a...

Страница 13: ...ing Instructions for Mixers and Showers Please follow the cleaning materials manufacturer s inistructions In addition pay attention to tlie following points Clean the mixers and showers as and when re...

Страница 14: ...ement 94282000 2 Shut off and diverter unit 96509000 3 Handle for shut off and diverter unit and temperature control 98664000 4 Check valve NV15 DN15 96737000 5 S unions 94140000 6 Escutcheon 96467000...

Страница 15: ...DN15 1 Thermostatic element 94282000 2 Shut off unit 94149000 3 Handle for shut off unit and temperature control 98664000 4 Check valve NV15 DN15 96737000 5 S unions 94140000 6 Escutcheon 96467000 7...

Страница 16: ...r or spout dripping Dirt in the flow valve or shut off Clean or replace shut off unit unit damaged Warranty You have purchased a quality product from Hansgrohe All parts which show any kind of fault a...

Отзывы: