45
English
I n i t i a l u s e
Final checks
For function check connecting the Novaflex shower hose with the Aktiva F'4and shower including the mesh washer.
No leaks?
Are all areas sealed?
Do the showers function?
Does the lighting function?
Has the thermostat been aligned?
Is the customer informed and the customer envelope and the installation instruction handed over?
Is the warranty card filled out and sent to the manufacturer?
Power supply
Connect the power supply cable with the transformer and
after this you can connect the transformer with the mains
supply 230 V~ 50/60 Hz.
Thermostat alignment/motor alignment
To guarantee the function, perform after initial use the
thermostat/motor alignment as described in chapter
"Operating and servicing":
Flashing display showing 11 is a error message which
make necessary to perform a key-board reset as descri-
bed at page 23.
Perform the earthing in accordance to the local
regulations. The contacts must be free of oil
and grease