background image

Work gloves, Spirit level, Lubricant, rubber mallet,0.08" metal drill bit.

Silicone sealant, bradawl, crosshead screwdriver, step ladder,Tape.

risen with cool clean water.

Hot items such as recently used grills, blowtorches etc. can not be stored

Do not attempt to assemble this greenhouse when you feel tired , or have taken

Dispose of all plastic bags safely-keep them out of reach of little children.

PRODUCT SIZE

     SAFETY ADVICE

We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.
Always wear shoes and safety goggles when working with extruded
aluminum.

The greenhouse must be positioned and fixed on a flat level surface.
Do not lean against or push the greenhouse during construction.
Keep children away from the assemble area.
Do not position your greenhouse in an area exposed to excessive wind.

drugs or alcohol or if you are prone to dizzy spells.
If using a step ladder or power tools ensure that you follow the
manufactures safety advice.

in the greenhouse.
Ensure there are no hidden pipes or cables in the ground before inserting
the pegs.

    

GENERAL ADVICE

This is a multi-part assembly, Allow at least 60 minutes for assembly.
Selecting a site-choose a sunny level position away from overhanging trees.
If you are fixing your greenhouse directly to a solid concrete foundation use
the pre drilled holes in the metal base supplied.
The component parts should be checked and laid out close at hand.
Keep all small parts(screws etc)in a bowl so they do not get lost.
Note that the door is hinged on the right hand side and therefore opens to
the right. Keep roof clear of snow and leaves.

     CARE & MAINTENANCE

When your greenhouse needs a clean, use a mild detergent solution and

Do NOT use acetone, abrasive cleaners or other special detergents to clean
the clear panels.

  

  TOOLS & EQUIPMENT REQUIRED

.

120cm

62cm

122

cm

88cm

166cm

47"

24.4"

34.6"

48"

66.5"

-3-

Содержание HANGHGBMN-1WHT

Страница 1: ...20 x W62 x H169 9820510 Assembly Instruction the assembly of the whole product quantity as mentioned in the list Do not tighten the steps until completing on IMPORTANT Please ensure that you find all...

Страница 2: ...ipt if available Name and address of the Purchaser Name of retailer Or call our Customer Service team between 9 00 AM and 5 00 PM Eastern Time Monday through Friday at 1 877 397 5144 or visit our webs...

Страница 3: ...house in an area exposed to excessive wind drugs or alcohol or if you are prone to dizzy spells If using a step ladder or power tools ensure that you follow the manufactures safety advice in the green...

Страница 4: ...R POLYCARBONATE PANEL Towards the white film side to the sun as it is UV protected P1 P4 P3 P6L P6R P3 P5 522mm 2 2 TOP 726mm 13 2 1102mm 522mm 5 1 14 2 TOP 6 1 726mm 22mm 7 2 1102mm 8 1 154mm 9 2 106...

Страница 5: ...B5 B10 B11 D2 B5 F3 F3 B11 x2 Base and Frame Assembly Anchor Installation Attach the anchor B5 to the corner of base B10 fix B5 anchors onto B10 and D2 by F3 screws Make sure all holes are all in alig...

Страница 6: ...Attach D2 B12 with 12 pieces F7 screws Workbench Assembly Align holes for D2 and B12 Panels of platform B12 Installation B7 x1 P6 F7 x12 F5 x8 x6 F7 F7 B12 D2 x8 F5 F5 F5 F5 F5 P6 P6 P6 B7 B7 B12 B12...

Страница 7: ...D2 F7 F7 B7 x2 D2 B7 F7 B7 B7 D2 D2 F7 F7 P6 F5 F5 F5 F5 P6 P6 B7 B12 B7 F7 F7 7 Install the last piece 4 pcs F7 screws the two frames D2 with of wall panel B7 and Fix the bottom panel P6 to the last...

Страница 8: ...pcs P8 panels for each wall Step 3 Ensure the bottom edge of base B10 the first P8 panel inserted into Step 4 two walls Repeat the step 2 for other Step 5 Ensure the bottom edge of the top edge of th...

Страница 9: ...against the first P9 panel inserted into Side wall panels Installation P9 P9 P9 D2 B10 D2 P9 P9 x4 P9 P9 P9 P9 D2 D2 D2 D2 Ensure the bottom edge of base B10 Ensure the bottom edge of Insert the firs...

Страница 10: ...gether in the middle with 2 pieces F6 screws 1 Put the 2 pieces panels P7 together Step 1 2 Make sure the two panels are against each other Edge frame D1 installation F6x6 Step 2 Fix D1 P7 with 6 piec...

Страница 11: ...to figure I Stick the 4 pieces on the inside surfaces of the 2 Door sealer S10 Installation B3 x2 DOOR B3 B7 B3 B7 F5 DOOR DOOR S10 S10 S10 B3 B7 B3 F5 x2 Cut the S10 adhesive stripe in 4 pieces 33 l...

Страница 12: ...5 B7 1 F5 B7 1 2 x2 2 2 1 1 Don t fully lock F5 screws Step I Place10 pieces F5 screws into the pre drilled holes on the upper not fully locked Step II and ensure the tail of F5 screws inserting into...

Страница 13: ...1 1 13 x2 3 3 13 13 6 6 1 2 2 F4 F4 F4 F4 F4 Installation for the frame of greenhouse Don t lock F4 screws Step I but don t fully tighten them 1 profiles Step II into the frame profiles 3 Inserting t...

Страница 14: ...greenhouse 5 x1 9 x2 F8 x2 F4 x13 7 x2 x2 9 F4 F4 F4 F4 5 x2 F4 F4 7 9 3 x2 3 9 F8 1 2 x2 14 x2 14 F4 F4 14 5 3 3 13 13 6 14 9 9 into 7 9 and 5 parts Fix the other end of part 9 on to part 1 with Rein...

Страница 15: ...ch 13 and 6 part Step I 25 400 25 400 12 x2 B1 x2 F4 x7 1 13 P3 P6L P6R P3 x2 4 P6R P6L 12 12 4 P3 P3 3 3 13 13 6 13 13 6 P3 P3 13 13 1 4 P3 P3 6 13 13 F4 F4 F4 F4 F4 F4 x2 B1 F4 F4 12 P6L B1 F4 7 12...

Страница 16: ...p IV in each of profile 13 in each of profile 12 Step III 8 B6 x2 F4 x9 x2 F4 x2 8 B13 F6 x3 8 B13 B6 B6 12 13 6 13 F4 x1 12 x2 13 F4 x1 8 F4 F4 12 12 F4 F4 F4 B13 F6 F6 F6 13 13 6 12 8 8 B13 8 B6 F4...

Страница 17: ...0 P5 F4 x2 F4 x2 10 F3x2 S8L S8R 10 P5 8 12 12 B1 B1 S8L S8R P5 10 B1 F4 x2 x2 S8L S8R F3 F3 B1 10 P5 P5 12 Roof Panel Installation Pre place 2xF4 screws into the profile 10 connecting profile 10 Step...

Страница 18: ...GB W5 W5 W4 W4 P4 P1 F3 F3 F3 F3 F3 F3 F3 F3 F8 F8 W5 W1 W1 P4 W5 F3 F3 Direction Direction W1 W4 F3 P1 W3 GB P1 F8 F8 S6 x2 S6 S6 S6 S6 F3 F3 W4 W4 W3 W3 P1 Direction Middle Window Bottom Window Han...

Страница 19: ...11 12 10 W5 11 W4 W5 W1 W1 11 10 W1 W5 W5 W1 W1 W4 11 S8L x2 S3 8 F3 S3 P1 P4 12 3 12 13 11 11 Installation for rail 11 Insert rail profile 11 into the grooves of profile 10 Roof corner plastic caps...

Страница 20: ...S7L S7R S9L S9R S5 x2 F2 x2 x2 S7L S5 S9L F2 F1 F1 W5 x4 11 11 W5 W4 S9L S7L S7R S9R S5 S5 Installation for plastic end caps Install S7R in same way Install S7L with 2 pieces F1 screws Install S9R in...

Страница 21: ...21 Plastic corner caps S1 S1L and S1R installation S1 x2 S1L S1R F3x6 F3 F3 F3 S1 S1L x2 x2 S1 S1L S1R Lock all F4 F5 F6 F8 Screws Congratulation You did it...

Страница 22: ...22 Display how to open and close the window and door...

Страница 23: ...ots or dirt is shown 3 The boards panels have flame retardant polycarbonate material applied to them 2 Clean films regularly to keep the light transmittance as clear as possible and is recommended to...

Страница 24: ...et functions essentially as new including tears rips chips scratches or stretching of materials and stitching 3 Tears rips punctures scratches or any damage caused by improper installation or use 4 Fa...

Отзывы: