surfaces of B7 and B12, then mount the nuts but
Installation for base frame of greenhouse.
1 x2
F5 x10
!
F5
F5
F5
F5
F5
Ⅰ
B7
B12
B7
B12
B7
F5 x10
Ⅱ
x2
2
1
B12
B7
B12
B7
F5
F5
F5
B7
1
F5
B7
1
2 x2
2
2
1
1
Don't fully lock F5 screws
Step I:
Place10 pieces F5 screws
into the pre-drilled holes on the upper
not fully locked.
Step II:
and ensure the tail of F5 screws inserting into
Install the 1# profile by pushing it above B7
the groove of 1# profile.
Amplifying detailed figure.
-12-
Silicon
Silicon
Seal the gaps between
every two panels.
Silicon
B7
B12