background image

2 pieces F8 screws for one handle,

Assembly for windows

Handle Installation

2 handles total.

Middle Window

Bottom Window

-17-

Step IV:

Step II:

1.Note the direction of W5;
2.Note the parts P4 & W1 
are involved in the groove
of W5.

Step III:

of W4.

1.Note the direction of W4;
2.Note the parts P4 & W1 
are involved in the groove

Содержание 9820511

Страница 1: ...sembly Instruction the assembly of the whole product quantity as mentioned in the list Do not tighten the steps until completing on IMPORTANT Please ensure that you find all parts in the correct type...

Страница 2: ...ipt if available Name and address of the Purchaser Name of retailer Or call our Customer Service team between 9 00 AM and 5 00 PM Eastern Time Monday through Friday at 1 877 397 5144 or visit our webs...

Страница 3: ...ea Do not position your greenhouse in an area exposed to excessive wind drugs or alcohol or if you are prone to dizzy spells If using a step ladder or power tools ensure that you follow the manufactur...

Страница 4: ...29 7 S10 43 3 13 8 26 5 43 3 43 3 41 8 41 41 12 7 10 7 41 33 2 34 45 6 45 6 45 6 45 7 43 7 45 45 5 4...

Страница 5: ...D2 by F3 screws Repeat the step to complete anchor installation for other 3 corners Attach the anchor B5 to the corner of base B10 Make sure all holes are all in alignment and then Base and Frame Ass...

Страница 6: ...of workbench P6 Installation Attach D2 B7 with 12pieces F7 screws Attach P6 onto B7 with 8 pieces F5 screws Align holes for D2 and B7 Step II Panels of platform B7 Installation Step I 6 Workbench Ass...

Страница 7: ...B8 with 6pcs F5 screws 14 pieces total with 6pcs F5 screws 4 pcs F7 screws the two frames D2 with of wall panel B7 and Don t lock F5 with 2pcs F5 screws of all F5 screws Finish the mounting Step 6 Ste...

Страница 8: ...is against base B10 the first P8 panel inserted into 2 pcs P8 panels for each wall Side back wall panels Installation Water Pipes Installation Step 1 8 How to install the water pipe kit Step I Insert...

Страница 9: ...S2L and Installation for plastic door Step 3 Step 2 1 Put the 2 pieces panels P7 together Door Assembly Step 1 2 Make sure the two panels are against each other Edge frame D1 installation F6x6 Fix D1...

Страница 10: ...ding to figure I Stick the 4 pieces on the inside surfaces of the 2 pieces front D2 Cut the S10 adhesive stripe in Installation for door sealer S10 S10 S10 S10 4 pieces 33 long There are 2 holes on pa...

Страница 11: ...7 Place10 pieces F5 screws into the pre drilled holes on the upper surfaces of B7 and mount the nuts but Step II Silicon Silicon Silicon Installation for base frame of greenhouse not fully locked the...

Страница 12: ...tes on into the long frame profiles 6 the F4 screws 1 profiles Step III Step II into the frame profiles 3 Installation for the frame of greenhouse Inserting the tail of F4 screws of mini greenhouse St...

Страница 13: ...1 with Step VI Step V Step IV Reinforcing rib 9 installation 1 piece F4 Step I II III Installation for the beam 7 of greenhouse Installation for the beam 9 of greenhouse Installation for the beam 5 o...

Страница 14: ...s 7 Pre place part B1 into the Install panels P4L P4R into posts 3 and 6 Step III Step II Detailed cutting figure Step I Side PC wall panels P4L P4L installation Roof frames 4 installation Roof frames...

Страница 15: ...Step III Step II Pre embedding 2 pieces Installation for Roof Beam and Fixation Profiles F4 screws in the holes at each end of roof beam 8 Inserting the roof beam 8 into frame profiles 4 and lock the...

Страница 16: ...S8L S8R Assemble profile 10 on Pre place 2xF4 screws profiles 4 and cover the end edge with connecting profile 10 Inserting P3 PC panel into frame Roof Panel Installation into the profile 10 Part B1...

Страница 17: ...andle Installation 2 handles total Middle Window Bottom Window 17 Step IV Step II 1 Note the direction of W5 2 Note the parts P4 W1 are involved in the groove of W5 Step III of W4 1 Note the direction...

Страница 18: ...f the roof using a screw part F3 on each side Installation for rail 11 Insert rail profile 11 into the Roof corner plastic caps S3 installation grooves of profile 10 18 Attach Roof Corner Caps Part S3...

Страница 19: ...F2 screws Install S9R in same way Install S9L with 2 pieces F1 screws Install S7R in same way Install S7L with 2 pieces F1 screws Plastic end caps Installation 19 Install S9R in same way Install S9L...

Страница 20: ...Installing plastic parts S1 S1L and S1R 20 Your work is complete Enjoy Tighten all Nuts Bolts and Screws on the entire Greenhouse...

Страница 21: ...Display how to open and close the window and door 21...

Страница 22: ...ots or dirt is shown 3 The boards panels have flame retardant polycarbonate material applied to them 2 Clean films regularly to keep the light transmittance as clear as possible and is recommended to...

Страница 23: ...et functions essentially as new including tears rips chips scratches or stretching of materials and stitching 3 Tears rips punctures scratches or any damage caused by improper installation or use 4 Fa...

Отзывы: