background image

3

When your greenhouse need cleaning, use a mild detergent solution and risen with cool clean water.

Note that the door is hinged on the right hand side and therefore opens to the right side.

Hot items such as recently used grills, blowtorches must not be stores in the

Dispose of all plastic bags safely. Keep them out of reach of small children.

Do NOT use acetone, abrasive cleaners or other special detergent to clean the panels.

This is a multi-part assembly and needs at least 3-4 hours for assembly.

!

     SAFETY ADVICE

We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.

Always wear shoes and safety goggles when working with extruded aluminum.

The greenhouse must be positioned and fixed on a flat level surface.

Do not lean against or push the greenhouse during construction.

Keep children away from the assemble area.

Do not position your greenhouse in an area exposed to excessive wind.

Do not attempt to assemble this greenhouse if you are tired ,have taken drugs or

alcohol or if you are prone to dizzy spells.

If using a step ladder or power tools ensure that you follow the manufactures safety
advice.

greenhouse.

Ensure there are no hidden pipes or cables in the ground before inserting the pegs.

    GENERAL ADVICE

Selecting a site-choose a sunny level position away from overhanging trees.

If you are fixing your greenhouse directly to a solid concrete foundation use the pre

drilled holes in the metal base supplied.

The component parts  should be checked and laid out close at hand.

Keep all small parts (screws etc)in a bowl so they do not get lost.

Keep roof clear of snow and leaves.

  

CARE & MAINTENANCE

  

Содержание 9820102-1

Страница 1: ...uction Metal Base of Greenhouse the assembly of the whole product quantity as mentioned in the list Do not tighten the steps until completing on IMPORTANT Please ensure that you find all parts in the...

Страница 2: ...ipt if available Name and address of the Purchaser Name of retailer Or call our Customer Service team between 9 00 AM and 5 00 PM Eastern Time Monday through Friday at 1 877 397 5144 or visit our webs...

Страница 3: ...ded aluminum The greenhouse must be positioned and fixed on a flat level surface Do not lean against or push the greenhouse during construction Keep children away from the assemble area Do not positio...

Страница 4: ...2 Angle Square 3 Level Meter Silicon 8 Percussion bit 10mm 25 64 7 Marking Pen 6 Wooden Mallet 5mm 13 64 inch hexagon wrench 5 Electric screwdriver 4 Hexagon wrench 5mm 13 64 inch 1 Triangle Stair 5...

Страница 5: ...5 PART LIST...

Страница 6: ...6 Do not fully tighten screws...

Страница 7: ...7 F1 Door Assembly Note Lay the door frame on a flat surface Make sure that door is square and even before tightening screws...

Страница 8: ...8 Note Make sure that the window is flat and even before rightening all screws Window Installation Window supporting knob...

Страница 9: ...9 Pre place F4 screws in below parts and quantity Screw Preparation...

Страница 10: ...lace 1 piece F4 screws in parts 10R 10L part 4 5 and 6 with pre placed F4 screws in Frame Installation Fix the frame at each corner should be placed 3 pieces screws There are 2 pieces groove in part 7...

Страница 11: ...S2 2 Attach rails 12 15 12 3 Attach panels P4R P6 P4L to rails 12 15 12 Pre place 2 pieces F4 screws into each part 12 and 15 Fix the beam of back wall 14 with the pre placed F4 screws at previous ste...

Страница 12: ...to 9 and 1 you need to pre place 3 pieces F4 screws pieces groove in part 7 and placed 4 pieces screws There are 2 Front Wall Installation piece F4 screw in the other groove screws pre placed in previ...

Страница 13: ...13 7 and parts 9 with Front Wall Installation Pre place 2 pieces F4 screw in each part 12 Fix parts 12 onto part pre placed screws PC panels installation...

Страница 14: ...ms Installation Fix part 8 on to part 7 with the preplaced F4 screws Pre place 2 pcs F4 screws in each part 9 Fix parts 16 onto part 8 with F4 screws according to the figure 2 pieces screws for each 1...

Страница 15: ...n parts 16 Install roof crown 17 Combine parts 9 13 and 16 Roof beam Installation and Screwing Pre place 2 pieces F4 screws into each part 16 13 16 16 16 16 16 16 16 16 9 9 with parts B4 using F4 bolt...

Страница 16: ...16 Corner Fixation Plates Installation Corner caps B5 B6 Installation with the pre placed screws Upper door rail installation...

Страница 17: ...ndow and insert 2 No 20 Installation Middle Wall Frame No 19 Installation Roof Middle Frame Fix 2 pcs F4 screws in each 19 part Please insert 4 screws in the two 20 profiles beside screws in other 20...

Страница 18: ...ion Fastenings and Reinforcing Ribs Installation 1 Assemble the window base B7 15 using bracket B1 with the pre placed F4 scerws in part 20 1 Assemble the six cross braces 22 and four cross braces 23...

Страница 19: ...llation 1 Insert the wall panels P8 into the grooves of 7 and 19 2 Button the part S2 onto the bottom of each P8 panel then push the P8 panels to the bottom against the part 4 1 Insert all roof panels...

Страница 20: ...ert two gutters 25 Drain Profiles Water Outlet and End Caps Assembly Finishing Triming Using a water level or square to make sure that your greenhouse is straight and level Tighten hex bolts at this t...

Страница 21: ...is the case please fix immediately to avoid damage 2 Please prevent adding any increased weight to the product compromise the structure and durability of the product If the structure is compromised it...

Страница 22: ...et functions essentially as new including tears rips chips scratches or stretching of materials and stitching 3 Tears rips punctures scratches or any damage caused by improper installation or use 4 Fa...

Отзывы: