14# part should be installed
12# and 15# parts are short parts,
covering on the top of PC panels;
11
to panels P3-P5-P3.
Back Wall Installation
1.Attach panels P3-P5-P3
to base with S2.
2.Attach rails 12-15-12
3.Attach panels P4R-P6-P4L
to rails 12-15-12.
Pre-place 2 pieces F4 screws
into each part 12# and 15#.
Fix the beam of back wall 14#
with the pre-placed F4 screws
at previous step in parts
7#,10L,10R,12# and 15#.
14# part is a long part across
the whole width of greenhouse.
on 10L/R and 7#.
Parts 12# and 15# are fixed on
the part 14# with the pre-placed
screws F4.
Содержание 9820102-1
Страница 5: ...5 PART LIST...
Страница 6: ...6 Do not fully tighten screws...
Страница 9: ...9 Pre place F4 screws in below parts and quantity Screw Preparation...