background image

In selecting a site-choose a sunny level position away from overhanging trees.

If you are fixing your Aluminum Greenhouse directly to a solid concrete foundation use the

This is a multi-part assembly, allow at least 3-4 hours for assembly.

Do not lean against or push the Aluminum Greenhouse during construction.

Do not attempt to assemble this Aluminum greenhouse if you are tired ,have taken drugs or

Do not position your Aluminum greenhouse in an area exposed to excessive wind.

Do not attempt to assemble the Aluminum greenhouse in windy or wet conditions,

The Aluminum greenhouse must be positioned and fixed on a flat level surface.

Aluminum greenhouse needs cleaning, use a mild detergent solution and rinse

clear panels.

  

Hot items such as recently used grills, blowtorches etc.must not be stored in the Wall shed.

Keep children away from the assembly area.

!

     SAFETY ADVICE

We strongly recommend the use of work gloves during assembly.

Do not touch overhead power cables with the aluminum profiles.

Always wear shoes and safety goggles when working with extruded aluminum.

 alcohol or if you are prone to dizzy spells.

If using a step ladder or power tools ensure that you follow the manufactures safety advice.

Ensure there are no hidden pipes or cables in the ground before inserting the pegs.

Dispose of all plastic bags safely and keep them out of reach of children.

Note that the door is hinged on the right hand side and therefore opens to the right space needed.

    GENERAL ADVICE

pre drilled holes in the metal base supplied.

The component parts should be checked and laid out close at hand.

Keep all small parts(screws etc)in a bowl so they do not get lost.

Keep roof clear of snow and leaves.

with cold clean water.

  

CARE & MAINTENANCE

When your 

Do NOT use acetone, abrasive cleaners or other special detergents to clean the

Содержание 9820101-1

Страница 1: ...Overall Size CM L190 x W190 x H195 Overall Size inch L75 x W75 x H77 Do not tighten the steps in the greenhouse until completing on the assembly of the polycarbonate panels 9820101 1 9820101 2 ...

Страница 2: ...ll shed Keep children away from the assembly area SAFETY ADVICE We strongly recommend the use of work gloves during assembly Do not touch overhead power cables with the aluminum profiles Always wear shoes and safety goggles when working with extruded aluminum alcohol or if you are prone to dizzy spells If using a step ladder or power tools ensure that you follow the manufactures safety advice Ensu...

Страница 3: ...wdriver 4 Hexagon wrench 5mm 13 64 inch 1 Triangle Stair 5 feet height 2 Spanner 10mm 25 64 Ratchet Wrench is better 3 Spanner 14mm 35 64 Install the expansion screw 10 Phillips screwdriver 9 Knife 1 Helmet 2 Glove 3 Long Sleeve Cotton Overalls 4 Emergency Medicine Cabinet 5 Eye Shield 2 Angle Square 3 Level Meter 16 4Feet 1 Tape Measure Advised Installation Tools ...

Страница 4: ...T5 13 64 M4 5 32 2 Parts List M5 13 64 M4 5 32 T5 13 64 M5 13 64 ...

Страница 5: ...Do not fully tighten screws ...

Страница 6: ...Door Preparation F1 Note Lay the door frame on a flat surface Make sure that door is square and even before tightening screws ...

Страница 7: ...Window Preparation Note Make sure that the window is flat and even before tightening all screws ...

Страница 8: ...Screw Insertion Preparation Assemble the base 4 5 4 6 as shown on the next page Screw insertion preparation ...

Страница 9: ...Corner Posts Installation 1 Assemble upright 10R 10L for the bae panels 2 Insert hex bolts in quantities shown ...

Страница 10: ...Back Wall Assembly Installation 1 Attach panels P3 P5 P3 to base with S2 2 Attach rails 12 15 12 to panelsP3 P3 P3 3 Attach panels P4R P6 P4L to rails 12 15 12 Hand tighten bolts as shown ...

Страница 11: ...Front Frame Installation Assembly top of door frame 1 Assembly upright 9 9 for door frame 2 Insert hex bolts in quantities shown ...

Страница 12: ... Installation 1 Attach panels P3 to base with S2 2 Insert hex bolts in quantities shown 3 Attach rails 12 12 to panels P3 and P3 4 Attach P4R P4L and P7 as shown Install corner backs as shown Do not fully tighten ...

Страница 13: ...Side Beams Installation 1 Install crossbars 8 8 hand tighten only 2 Insert hex bolts in quantities shown Insert every rim 16 as shown Hand tighten hex bolts only ...

Страница 14: ...Beam Installation Insert hex bolts in quantities shown A Install doorway corner braces where 13 and 16 meet using hex bolts B Install roof crown 17 using F4 bolts previously inserted see detail on next page ...

Страница 15: ...Fastenings Installation ...

Страница 16: ...crew Insertion Preparation 1 Assemble remaining uprights 19 2 Insert hex bolts F4 in quantities shown Please insert 4 screws in the two 20 profiles beside the window and insert 3 screws in other 20 profiles ...

Страница 17: ...ibs Installation 15 15 15 1 Assemble the window base B7 15 using bracket B1 2 Assemble corner brace to rails 17 20 26 as shown 1 Assemble the six cross braces 22 and four cross braces 23 as shown using the pre inserted hex bolt F4 ...

Страница 18: ...Side and Roof Panels Installation 1 Insert six P8 panels into S2 at the base 1 Insert all roof panels P9 P10 2 Install gutter 25 to keep roof panels in place see next page ...

Страница 19: ... Drain Profiles Water Outlet and End Caps Assembly Insert two gutters 25 Using a water level or square to make sure that your greenhouse is straight and level Tighten hex bolts at this time Install all end caps and trim ...

Страница 20: ...s is the case please fix immediately to avoid damage 2 Please prevent adding any increased weight to the product compromise the structure and durability of the product If the structure is compromised it can easily cause the frame to crack break or collapse PC Panel Maintenance 2 If films rupture you may use glue to repair or use transparent tape Polyurethane adhesive is also available for repairs ...

Отзывы: