background image

10FT

  

BEFORE YOU START

Owner's Manual

Prior  to  installation,  it  is  important  that  you  contact  your  local  government  authority  to

determine  if  building  approval  is  required.  Study  and  understand  this  owner's  manual.

Important  information  and  helpful  tips  will  make  your  construction  easier  and  more

enjoyable.

Assembly instructions

Instructions  are  supplied  in  this  manual  and  contain  all  appropriate  information  for  your
building  model.  Review  all  instructions  before  you  begin.  During  assembly,  follow  the

step sequence carefully for correct results .

Parts

Check to be sure that you have all the necessary parts for the building.

      Separate contents of the carton by the part number while reviewing parts list.

           

Familiarize

 

yourself

 

with

 

the

 

hardware

 

and

 

fasteners

 

for

 

easier

 

use

 

during construction.

 

These

 

are

 

packaged

 

within

 

the

 

carton.

 

Note

 

that

 

extra

 

fasteners

 

have been

supplied for your convenience.

TOOLS MAY REQUIRED

Use heavy duty gloves when handling steel sheets and flashing

PLAN AHEAD

Watch the weather:

Please be sure the day you select for installation is dry and calm.

DO NOT

attempt to assemble your shed in windy weather

because

 

of

 

risk

 

of

 

damage

 

to

 

panels,

 

or

 

personal

 

injury.

 

Be

 

careful

of wet or muddy ground.

Teamwork:

Whenever possible, two or more people should work together to
assemble

 

the

 

building. One person can position parts or panels

while the other is able to handle the fasteners and the tools.

2

Содержание 9820010

Страница 1: ...112 x W243 x H176cm Size L44 x W96 x H69 Metal Garden Shed OWNER S MANUAL Instructions for Assembly Requires two people and takes hours for lnstallation Quick Easy Assembly Ridge Reinforced Walls 9820010 3 4 ...

Страница 2: ...he building Separate contents of the carton by the part number while reviewing parts list Familiarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience TOOLS MAY REQUIRED Use heavy duty gloves when handling steel sheets and flashing PLAN AHEAD Watch the weather Please be...

Страница 3: ...a concrete pad The bricks or blocks should be cemented onto firm and level concrete footings and the greenhouse frame drilled and screwed to the base IMPORTANT NOTES l Find someone to help you it is much easier with someone to hold parts pass tools ect Also some steps require two people to lift structures together This is not very heavy work so would suit most able bodied people l Allow plenty of ...

Страница 4: ...L 944mm 1 2R 1 10L 1762mm 2 10R 391mm 1 3 35 36 1510mm 13 1 14 1 1704mm 15 1 1731mm 1520mm 1721mm 1711mm 4L 1 4R 1 5L 1 5R 1 21L 21R 1 1 7 1 6 1 1736mm 6 1 1 2 1 1 3 3 893mm 30 799mm 31 32 1634mm 33 40 41 1475mm 2 17 1111mm 2 20 120mm 1800mm 70 8 37 1 944mm 16 7 426mm 37 1 944mm 35 1 893mm 59 5 1510mm 68 64 3 1634mm 64 3 1634mm 58 1475mm ...

Страница 5: ...0 F3 F1 F2 PART NO Qty PART NO Qty S3 S2 B6 J1 8 S4 2 1 18R 1 19L P2 1 1704mm P3 2 1510mm D1 1 1474mm D2 2 1633mm P5 4 1110mm P6 1 3 GF 9 4 GC 120 240 1 18L 1210mm 1 19R 6 6 29 29 1 GB 2 H2 2 2 GJ 47 6 1210mm 47 6 1210mm 47 6 1210mm 47 6 43 7 1110mm ...

Страница 6: ...15 GC 10R 10L 21R 21L GF GF GF 7 4R B6 B6 B6 B6 D1 P2 10R 6 4L 5R 5L 36 35 35 36 31 32 31 30 30 30 30 33 B6 B6 29 29 1 29 1 29 H2 H2 29 29 1 29 1 29 29 1 29 29 29 1 41 40 30 30 36 35 B6 P3 P1 P1 D2 D2 GC GC GC P5 P5 P5 P5 P6 17 17 18L 18R 19L 19R 20 20 GB GB GJ GJ ...

Страница 7: ...S4 PART NO Qty Q 1 1 1 1R 2L 1 1 H 1L 1 2R 1 3 J1 8 S4 2 S4 F1 F1 F1 Base Assembly 10FT 1 When diagonal measurements are equal the frame is square Base Assembly Inspection 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly ...

Страница 8: ...8 Wall panels installation S3 PART NO Qty 5L 1 P1 2 F2 S3 P1 P1 5L Q F1 S3 PART NO Qty 13 1 P3 1 PART NO Qty 14 1 15 1 P1 2 F1 S3 P1 P1 14 15 F2 S3 F1 F1 13 F2 S3 P3 P1 P1 P1 2 5 16 5 16 ...

Страница 9: ...ion Anchor Installation Wall panels of side storage Installation PART NO Qty P3 1 4R 1 F1 S3 F2 S3 P3 4R F1 F1 S3 PART NO Qty 4L 1 P2 1 5R 1 5R 4L F2 F1 F1 P2 21R 21L GF GF PART NO Qty 21L 1 21R 1 GF 2 F2 5 16 5 16 5 16 ...

Страница 10: ...10 Left Middle Tri angle panels Right tri angle panel installation Vent Installation F1 S3 PART NO Qty GF 7 7 1 GF 1 21L 21R F2 7 F1 S3 5 16 ...

Страница 11: ...11 Roof panels Installation Front Beam Installation Tool Hangers Installation PART NO Qty 1 10L 1 10R PART NO Qty 1 10R 6 1 10R PART NO Qty P5 1 P6 1 S3 F1 P5 P6 2 GJ F1 S3 10R 10L 10L GJ 6 10R F1 S3 ...

Страница 12: ...bination Left and right eaves Installation Roof Panels Fixation 17 17 PART NO Qty P5 3 S3 F1 P5 P5 P5 P5 P6 P5 P5 P5 PART NO Qty 2 17 S3 F2 S3 F2 17 17 PART NO Qty 1 18R 1 19L 1 18L 1 19R 2 20 18L 18R 19R 19L 20 20 20 S3 F1 5 16 ...

Страница 13: ...on PART NO Qty GC 4 GC GC GC GC 19R 19L 18L 18R S3 F1 F1 18R 18L 19R 19L PART NO Qty 6 29 6 29 1 6 30 29 29 1 30 x6 F1 PART NO Qty 1 31 1 32 D2 1 D2 31 32 S3 F2 D2 31 32 Front and Back Installation Door Frame Installation 5 16 ...

Страница 14: ...14 S3 F1 S3 F2 32 PART NO Qty 1 35 1 36 3 B6 F3 31 F1 35 36 Door Assembly Reinforcing ribs Installation Hinges Installation 5 16 5 16 ...

Страница 15: ...15 Right Door Assembly Bolt Lock installation H2 H2 F3 PART NO Qty H2 2 PART NO Qty 1 31 1 33 D2 1 D2 31 33 S3 F2 D2 31 33 Left Door Fixation 5 16 5 16 ...

Страница 16: ...1 33 D2 1 D2 31 33 S3 F2 S3 F1 S3 F2 33 PART NO Qty 1 35 1 36 3 B6 F3 31 F1 35 36 D2 31 33 Right Door Columns Assembly Door Frames Assembly Reinforcing ribs Installation Hinges Installation Corners Fixation 5 16 5 16 5 16 ...

Страница 17: ...17 Front Lock Installation F3 GB PART NO Qty GB 1 PART NO Qty 1 40 1 41 D1 1 D1 40 41 S3 F2 D1 40 41 Right Door Installation Door of Side Storage Assembly 5 16 5 16 ...

Страница 18: ...18 Corners Fixation Reinforcing ribs Installation S3 F1 S3 F2 41 PART NO Qty 1 35 1 36 3 B6 F3 40 F1 35 36 Door Frame Installation 5 16 5 16 ...

Страница 19: ...19 PART NO Qty GB 1 F3 GB Door Installation Lock Installation 5 16 ...

Страница 20: ...eceipt if available Name and address of the Purchaser Name of retailer Or call our Customer Service team between 9 00 AM and 5 00 PM Eastern Time Monday through Friday at 1 877 397 5144 or visit our website at www Hanover Products com To expedite any future warranty claims please retain your receipt for future use For additional on line support on assembly troubleshooting and care maintenance of y...

Страница 21: ...yet functions essentially as new including tears rips chips scratches or stretching of materials and stitching 3 Tears rips punctures scratches or any damage caused by improper installation or use 4 Fading and or discoloration of materials resulting from exposure to the elements chemicals oils fluids or any other cause are not covered To make a claim contact us by the email address or the toll fre...

Отзывы: