background image

9

CAL

iB

rA

TiON

Probe Cabling Color Code

Marking

Color

Functionality

GREEN

0V

B

WHITE

RS485 D –

A

YELLOW

RS485 D+

+

BROWN

5V

GREEN / YELLOW 

PROTECTIVE GROUND CONNECTION

9.  CALIBRATION

HI510

 Controller allows two types of DO calibration procedures:

•  Standard calibration − a two-point calibration with standards

•  Process  calibration  −  available  only  if  the  probe  has  been  calibrated  in 

standards previously

Standard Calibration

Preparation

A two point calibration with standards verifies the probe is working correctly and 

establishes a slope. 

•  Verify the probe is filled with electrolyte and is connected to the controller.

•  Verify the controller’s barometric pressure reading with a reference meter. The 

pressure value can be adjusted from the controller’s Technical Menu.

•  Set the Salinity value if probe will be exposed to ocean or brackish waters.

•  Set controller to desired measurement unit. Go to Probe Setting in Channel 

Setup. Choose between DO_Sat (% saturation) or DO_Conc (Concentration).

Procedure

A two point calibration uses air and zero oxygen solution to calibrate. 

1.  Press MENU direct key (   ) then 

CAL

 virtual key. The controller recognizes 

the currently selected measuring unit.

2.  Suspend the probe into the water-saturated air and wait for the probe to 

reach thermal equilibrium. 

3.  Press 

CFM

 when displayed followed by 

Next.

4.  Submerge the probe into 

HI7040

 Zero oxygen solution and stir gently for 

2-3 minutes. Wait for the temperature and probe values to become stable. 

The meter will automatically recognize the 0% (ppm) standard. 

5.  Press 

CFM

 to confirm the second calibration point and save the calibration.

Process Calibration

A process calibration is a single point calibration performed with the probe 

installed in the process. This type of calibration allows the user to adjust the 

measured DO value so that it matches the value determined with the hand-held 

meter. Prior to performing a process calibration, a hand-held meter and probe 

must be used to determine the DO value of the process. 

Preparation

•  Determine the process DO value, using a calibrated portable meter and probe.

•  The process controller and the probe should have previously been calibrated 

with two standards (so a probe slope has been determined).

Procedure

1.  Press MENU direct key (   ) then 

CAL

 virtual key. 

2.  Press 

Process

 when it is displayed. 

3.  Adjust the process value in agreement with the predetermined value using the 

directional keys ( 

 ). Press 

CFM

 to confirm and save the calibration.

10.  MAINTENANCE

DO Probe & Cap Membrane Cleaning

•  Inspect, clean, and calibrate the probe at regular intervals. Alternatively, follow 

Standard Operating Procedures (SOP) guidelines.

•  Rinse the probe, with cap assembled, with clean water. Blot the probe with a 

soft cloth or tissue. Handle the probe and membrane carefully to avoid damage.

Содержание HI7640-18 Series

Страница 1: ...INSTRUCTION MANUAL HI7640 18 Series Galvanic Dissolved Oxygen Industrial Smart Probe dedicated to HI510 Process Controller HI7640 1805 SN XXXXXXXXXXXX 0 to 50 ppm mg L T 5 to 50 C p max 3 bar...

Страница 2: ...a Hanna Instruments product Please read this instruction manual carefully before using this instrument This manual will provide you with the necessary information for correct use of this instrument a...

Страница 3: ...Safety Measures 4 3 General Description 4 4 Main Features 5 5 Specifications 5 6 Preparing for Use 6 7 Installation 6 8 Wiring the Probe to the Controller 8 9 Calibration 9 10 Maintenance 9 11 Access...

Страница 4: ...tructions in this manual 3 GENERAL DESCRIPTION The HI7640 18 is a galvanic style oxygen probe series designed for use with the Hanna Instruments HI510 Universal Process Controller The probe is suited...

Страница 5: ...5 0 to 50 0 C 23 0 to 122 0 F Temperature accuracy 0 5 C 1 0 F Temperature compensation 5 0 to 50 0 C 23 0 to 122 0 F Body PVDF Sensor type Galvanic cell Cathode Silver Ag Anode Zinc Zn Water movement...

Страница 6: ...he fill hole aligned upright slowly insert the sensing tip into the membrane cap so excess electrolyte and any remaining trapped air escapes through the fill hole 9 Screw the membrane cap onto sensor...

Страница 7: ...ugh the pipe cap opening 3 3 Screw the subassembly onto the PCV pipe 5 4 Tighten the cable locking system 2 to secure the cabling When removing the probe from tank fish tank water treatment tank or sa...

Страница 8: ...thread 8 WIRING THE PROBE TO THE CONTROLLER 1 Run the probe cable through the conduit opening 2 Connect the probe leads to the removable terminal connector marked PROBE Follow the lead markings positi...

Страница 9: ...hen displayed followed by Next 4 Submerge the probe into HI7040 Zero oxygen solution and stir gently for 2 3 minutes Wait for the temperature and probe values to become stable The meter will automatic...

Страница 10: ...clean the cathode with a lint free cloth 7 Follow section 6 of this manual for filling instructions Long Term Storage Discard any electrolyte solution from the reservoir and flush probe body and reser...

Страница 11: ...used Any variation introduced by the user to the supplied equipment may degrade its performance Do not use or store the product in hazardous environments WARRANTY The probes are warranted for six mon...

Страница 12: ...World Headquarters Hanna Instruments Inc Highland Industrial Park 584 Park East Drive Woonsocket RI 02895 USA www hannainst com MAN7640 18 Printed in ROMANIA...

Отзывы: