
Probe Dimensions & Cable Connection
6
7. PROBE DIMENSIONS & CABLE CONNECTION
Ø 28 mm (1.1”)
Ø 22 mm (0.9”)
3/4’’ NPT
38 mm (1.5")
17 mm (0.7")
182 mm (7.1")
183 mm (7.2")
Align the pins and key then push the plug into the socket.
Rotate the collar to lock in place.
Note
: Probe connection (probe with integral DIN connector) and probe wiring (probe with attached cable)
must be
carried out with the controller
disconnected
from power.
8. INSTALLATION
General considerations
• Probes are easily installed using the
3/4
” NPT external thread.
• Hand tighten the probe in position. Then, depending on the process, tighten one or two turns with a
wrench to secure in place. Do not exceed 10 N
•
m (7.3 lb-ft) torque specification for the probe sensor.
• Protect the probe and membrane from strong flow to prevent unstable readings. In turbulent aeration
basin installations, place the probe in a weir for more accurate readings.
• Do not install the probe in an upside-down position.
• Provisions must be made for the removal of the probe from the process.
• Consider probe accessibility for maintenance when selecting placement.