9
Items Required
• Main landing gear (2)
• Nose landing gear
• Landing gear strap (4)
•#4 x 1/2" sheet metal screw (8)
Tools Required
• Phillips screwdriver
• Hex wrench (included in kit)
• Threadlocking compound
Step 1
Locate the landing gear, #4 x 1/2" sheet metal screws and
the landing gear straps.
Step 2
Slide one of the main gears into the hole in the fuselage.
Step 3
Press the gear into the slot in the fuselage. Use two
landing gear straps and four #4 x 1/2" sheet metal
screws to secure the landing gear to the fuselage.
Step 4
Repeat Steps 2 and 3 to install the remaining main
landing gear.
Section 2: Landing Gear Installation