FIELD OPERATION
The
Top Shot
is “direct drive” which begins to operate immediately when the PTO is engaged. Drive
disengagement is made by shutting-off the tractor PTO. It is important that the PTO is engaged at low
tractor RPM. Shear bolt overload protection on the PTO is provided for both the main auger and the
expeller. For proper operation, establish and maintain the proper driveline alignment and tractor hookup.
Before loading material, adjust the hitch clevis to your tractor in order to obtain a level or forward attitude
of the
Top Shot
tank. Refer to the Preparing For Operation Chapter for additional details.
If the
Top Shot
is going to be operated in freezing temperatures, review and comply with recommendations
in Winter Operation.
WINTER OPERATION
When loading and spreading material during winter or in freezing temperatures, the following
recommendations apply:
1. After the
Top Shot
is unloaded and will not be used for some time, follow the EMERGENCY
SHUTDOWN PROCEDURE, then scrape away any solid material remaining on the inside of
the tank or Expeller area.
2. Park the
Top Shot
with the auger fully raised, the discharge gate fully raised and blocked.
Position the jack height so that liquids will run forward to the discharge opening.
3. Before loading the
Top Shot
again, unblock the discharge gate and engage the expeller to make
sure that it is free to rotate. Then, slowly lower the auger to the bottom of the tank and cycle
the discharge gate a few times.
OPERATION
APPLICATION RATE
The side discharge style
Top Shot
features a hydraulically operated discharge gate to control the material
flow out of the tank and into the expeller. Several factors influence the rate of discharge and the spread
pattern. These factors include: ground speed, type or consistency of discharge material, PTO RPM, and
discharge gate opening. Depending on your application requirements and the type of material being
spread, a full range of patterns can be obtained. A discharge gate indicator provides a continuous visual
display of the gate opening.
-18-
NOTE:
To eliminate freeze-up in the
area under the expeller, open the
expeller pan by pushing the trip handle
forward, the pan will release. Before
resuming operation, close the pan.
NOTE: The pan can be removed after
release of the trip handle by lifting it out
of the U-Shaped slots on each side of
the pan if freeze-up problems persist in
this area.
Содержание 5134
Страница 6: ...4 Intentionally Left Blank...
Страница 8: ...6 Intentionally Left Blank...
Страница 11: ...9 SAFETY INFORMATION...
Страница 12: ...SAFETY INFORMATION 10...
Страница 14: ...12...
Страница 38: ...SERVICE NOTES 36...