SF-816 operation manual
issue 1 16.04.07 display version 6 . plc controller version 30
P.30 of 36
the broken element with a new one; make sure that the red colored sealing
gasket is installed properly. Installation is just the reversal. After replacing a new
heater element, run the machine at 300
℃
for at least 10 minutes to break in the
heater before operating at higher temperature.
Heating element
Sealing gasket