![H&H SF-816 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/handh/sf-816/sf-816_operation-manual_3069148017.webp)
SF-816 operation manual
issue 1 16.04.07 display version 6 . plc controller version 30
P.16 of 36
7. Install a roll of seaming tape with the adhesive side facing the operator (refer to the section
on tape feeding).
8. The machine is ready for operation now.
9. The touch screen panel will on and showing the program loading page. After a while, it will
change to show the main control page.
Install tape
Sticky facing the operator