![H&H CS-653 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/handh/cs-653/cs-653_operation-manual_3068945010.webp)
CS-653 operation manual
issue 1 14.02.19
P.9 of 19
>
Preparation for Installation
Installation must be carried out by authorized personnel. Please act according to the following
steps :
1.
Remove the package of the machine and placed it on the ground level, cleaning the machine
before operation.
2.
Unleashing all packing cables which tie to the machine and allow it from free movement.
3.
Connect air hose to the inlet of the air regulating filter at the back of the machine, make sure
the air pressure not lower than 0.4Mpa. Once connected, the heat plate will go up with face
down while the cool plate will face to front side. You can connect the foot pedal (optional)
power plug with the corresponding socket at the back #15.
4.
Connect the power cord with a 220V, 10A power supply.
5.
Turn on the main power switch of the machine and switch on the power switch.
6.
The touch screen panel will on and showing the welcome note and program loading. After a while,
it will change to show the main control page.
Содержание CS-653
Страница 4: ...CS 653 operation manual issue 1 14 02 19 P 3 of 19 Precautions with regard to Safety cont...
Страница 5: ...CS 653 operation manual issue 1 14 02 19 P 4 of 19 Name Plate...
Страница 19: ...CS 653 operation manual issue 1 14 02 19 P 18 of 19 Appendix A Pneumatic Scheme...
Страница 20: ...CS 653 operation manual issue 1 14 02 19 P 19 of 19 Appendix B Wiring Scheme...