4.0 SITE LOCATION AND PREPARATION
4.1 Site Location.
The floor or plinth for the boilers and water manifold kit must be both flat and level to ensure correct alignment of
fittings and connections.
The floor or plinth must be sufficiently strong to support the weight of both the boilers and manifold kit where used.
The floor or plinth must be fireproof in accordance with BS 6644.
The plantroom must have sufficient space for installation of boilers, manifold kits, pipework, pumps controls, flues
ventilation, access and servicing and other items of plant.
4.2 Gas Supply.
Gas supply pipes must be in accordance with BS 6891 or IGE/UP/2
Gas supply connection to the boiler must not be smaller than the connection on the boiler - R1”
Gas installation must be soundness tested to BS 6891 or IGE/UP/1 & IGE/UP/1A.
Gas installation must be purged to BS 6891 or IGE/UP/1 & IGE/UP/1A.
Inlet gas pressure to boiler should be nominal 20mbar (minimum 17.5mbar) dynamic at the connection to the boiler.
Boiler house gas isolation valve must be clearly identified and installed close to the entrance / exit.
R 1” Gas Connection
Figure 4.2 – Gas Connection Point
Содержание Purewell Variheat mk2 110c
Страница 30: ...HAMWORTHY HEATING LTD 25 PUREWELL Variheat mk2 218612 A03 Figure 9 0 Boiler Wiring Schematic...
Страница 43: ...HAMWORTHY HEATING LTD 38 PUREWELL Variheat mk2 218612 A03...
Страница 53: ...HAMWORTHY HEATING LTD 48 PUREWELL Variheat mk2 218612 A03 Figure E1 2 Typical Piping Layouts...
Страница 68: ...HAMWORTHY HEATING LTD 63 PUREWELL Variheat mk2 218612 A03 NOTES...
Страница 69: ...HAMWORTHY HEATING LTD 64 PUREWELL Variheat mk2 218612 A03 NOTES...
Страница 70: ...HAMWORTHY HEATING LTD 65 PUREWELL Variheat mk2 218612 A03 NOTES...
Страница 71: ...NOTES...