Melbury HE, C 530 - 3000
5
We reserve the right to make changes to dimensions and construction
edition 12.2020
Hamworthy Heating Limited – Dorset BH17 ONF
2.2. Conformity and certificates
These boilers fulfill the requirements of the low voltage directive 2014/35/EU, of the EMC-directive 2014/30/EU
and the efficiency directive 92/42/CE and the GAR 2016/426.
The Melbury HE, C boiler range as well as the Melbury HE range with ECA-rating have efficiencies in
conformity with the requirements of the Enhanced Capital Allowance Scheme (ECA).
CE-certificate:
CE 0461
Type marking:
Boiler
01-226-598 X
Recuperator
01-236-686 X
3. Scope of supply
-
Boiler body (with recuperator in Melbury HE, C
version), flue gas collector and flue gas tube
-
Gas-tight boiler door, with insulation and burner connection (and flue gas fan connection, if ordered)
-
Furnace sight glass integrated in the boiler door
-
Supply and return tubes with flanges, counter flanges, gaskets and screws
-
Filling and discharge tubes with ball valves
-
Flue gas turbulators
-
Boiler insulation
-
Tread-proof boiler lid over the entire unit
-
All-around casing (packed separately)
-
Heat and sound proofing hood (if ordered)
-
Boiler control panel (version depending on order)
-
Temperature monitor (waterside) for recuperator outlet, supplied loose (Melbury HE, C
version)
-
Condensate outlet with siphon (Melbury HE, C
version)
-
Burner pipe insulation material (supplied loose)
-
Cleaning set
-
Installation and operating instructions
Содержание Melbury HE 530
Страница 2: ......