Routine Cleaning and Maintenance
Optional Service Rail Kit
(Part number GCI60-900)
Figure 11: GCI60 with Service Rail Kit
Figure 12: Close up of Front Rail
1. Remove Cast Ash Drawer Front.
2. Slide open the Cast Top.
3. Lift off Cast Sides.
4. Clip Side Rails to unit.
5. Attach Front Rail using the quick release pins
as shown in Fig. 12.
6. Adjust leg height and lock them in using
the thumb screws. (Fig 12)
7. Slide unit forward on rails.
Thumb Screw
Quick Release Pin
Hampton GCi60-2 Cast Pellet Insert Owner's Manual
14
Cleaning Your Pellet Stove