Assembly (continued)
Attaching the short bar
1 and
7
the short bar
2
Attach
the short bar
1 (C) and
short bar
2 (D) to the 3
M
panel (E) and 4
M
panel (F) using the M6*35mm hex bolts
(BB), washers (
CC
) and nuts (
DD
).
□
7
Attaching the double slideway
s
8
Clip the 3
M
double slideway
s
(G)
onto the 3
M
panel (E).
□
HAMPTONBAY.COM
Please contact 1-855-HD-HAMTPON
for further assistance.
BB
CC
CC
DD
E
E
Clip the 4
M
double slideway
s
(H)
onto the 4
M
panel (F).
□
F
F
Attaching the canopy
9
Place the canopy (M)
and (L)
over the roof structure
.
Then
insert the corners of the canopy (M)
and (L)
onto the roof
to tighten.
□
Attaching the
mosquito netting and
curtain to the gazebo
10
Place the netting (N) on the inside slide track.
The 4 nettings were
zippered into 1 piece in the package.
□
Place the curtain (O) on the outside slide track. Note that the 4
curtains are already zippered into the 1 piece in the package.
□
L
M
Hammer one ground stake (
FF
) through the hole
in the
bottom of each
post
(
I
) into soft ground to
stabilize
the
gazebo.
□
FF
G
G
H
H
1
O
D
D
C
C
F
E