7
WARNING
MAKE SURE THE TAB ON THE HANGER
BRACKET PROPERLY SITS IN THE GROOVE IN
THE HANGER BALL BEFORE ATTACHING
THE CANOPY TO THE BRACKET BY TURNING
THE HOUSING UNTIL IT DROPS INTO PLACE.
Tuck connections neatly into ceiling outlet
box.
Slide the canopy up to ceiling and over the 2
screws on the mounting bracket. Rotate canopy
clockwise. Next, while holding the canopy
with one hand, slide the canopy cover over the
screws and rotate clockwise until tight.
Note:
Adjust the canopy screws as necessary until the
canopy and canopy cover are snug. (Fig. 10)
1.
2.
Finishing the Fan
Installation
Outlet box
Ceiling
Mounting
Bracket
Screws
Canopy
Canopy
Bottom
Cover
Figure 10
Installing the Light Bulbs
& Glass Shade
Install 6 x15W (Max.) bulbs (provided).
Remove 1 of the 3 screws from the motor
housing, loosen the other 2 screws (Do not
remove). (Figure 11)
Place the glass housing plate onto glass
housing as figure 11.
Raise and hold the glass housing assembly
close to the motor housing, place the glass
housing plate key holes over the 2 screws
previously loosened from the motor housing,
turn the glass housing plate until it locks in the
place of the narrow section of the key
1.
2.
3.
4.
holes. Secure the glass housing assembly by
tightening the 2 screws loosened and the one
removed previously. (Fig. 11)
Figure 11
Screws
Glass Housing
Plate
Motor Housing
Bulbs
Glass Housing