HG2200/HG2200AT Operator’s Manual
Electric Strike System (ESID)
94 - Systems and Equipment
Assemble Voltage Detector
1. Drive voltage stake into ground at least 6’ (2 m)
away from any part of system.
2. Clip voltage limiter to voltage stake.
Assemble Grid Mat
1. Remove mat from storage.
2. Place mat next to operator’s station.
3. Connect bonding cables to grid mats.
4. Remove ground rod from storage.
5. Drive ground rod into soil near grid mat.
6. Move cords and cables under grid mat.
7. Connect ground cable clamp to ground rod.
Содержание HG2200
Страница 1: ...TECHNICAL PUBLICATIONS Operator s Manual HG2200 HG2200AT Issue 2 1 960 1119 Original Instruction ...
Страница 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls ...
Страница 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport ...
Страница 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe ...
Страница 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service ...
Страница 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications ...
Страница 136: ...HG2200 HG2200AT Operator s Manual Service Record 135 Service Record Service Performed Date Hours ...
Страница 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours ...
Страница 138: ...HG2200 HG2200AT Operator s Manual Appendix 137 Appendix Chapter Contents Tire Safety Information ...
Страница 146: ......