Pull New Product
Burst Pipe - 69
2. Continue pulling back rod string until bursting/splitting assembly reaches pit.
3. Connect one rod onto rod in bursting unit.
4. If not already in place, move bursting unit back in pit and position extraction cage between bursting
unit and existing pipe and pit wall.
5. Put bursting unit in pull mode and pull bursting/splitting system into extraction cage.
6. Remove extraction cage.
7. Disconnect and remove bursting/splitting system.
8. Remove bursting unit from pit.
9. Connect both ends of new product to existing pipe to complete job.
IMPORTANT:
Ensure extraction cage is level and centered. Move bursting unit forward until it is
firmly against extraction cage.
Содержание 100XTR
Страница 1: ...TECHNICAL PUBLICATIONS Operator s Manual 100XTR CMW Issue 2 1 960 1015 Original Instruction...
Страница 49: ...100XTR Operator s Manual Check Supplies and Prepare Equipment 48 Prepare...
Страница 54: ...100XTR Operator s Manual Tie Down Transport 53 Rod Box To tie down rod box use D rings shown j51om035w eps...
Страница 55: ...100XTR Operator s Manual Tie Down 54 Transport...
Страница 69: ...100XTR Operator s Manual Pull New Product 70 Burst Pipe...
Страница 77: ...100XTR Operator s Manual Extraction Cage 78 Systems and Equipment...
Страница 81: ...100XTR Operator s Manual Decommission Machine 82 Complete the Job...
Страница 95: ...100XTR Operator s Manual As Needed 94 Service...
Страница 102: ...100XTR Operator s Manual Service Record 101 Service Record Service Performed Date Hours...
Страница 103: ...100XTR Operator s Manual 102 Service Record Service Performed Date Hours...