12
Krok / Step 9
All pulleys (59), if not mentioned in another way,
are fixed with a screw, two washers (86) and a
safety nut (90)!
9-1: Attach pulleys 3 and 4 to the Main Upright
(2) as shown with the M10*45 bolts (94).
9-2: Pulley 5 is assembled with the Floating
Pulley Plates (28) and M10*45 bolts as shown.
9-3: Pulley 6 is assembled in the corner of the
Main Upright between the Top Beam Plates
(22) with the M10*45 bolt as shown.
9-4: Pulleys 7 and 8 are installed inside the 3”
round tube of the Main Upright. Pulley 7 is
above Pulley 8 and they are installed with the 1”
Step Spacers (46) as shown on both sides
of the tube.
Všechny kladky (59), pokud není uvedeno
jinak, jsou upevn
ěny šroubem, dvěma pod-
ložkami (86) a pojistnou maticí (90)!
9-1: P
řipevněte řemenice 3 a 4 k hlavnímu
sloupku (2) podle obrázku pomocí šroub
ů
M10*45 (94).
9-2: Kladka 5 je smontována s plovoucími
deskami kladky (28) a šrouby M10*45, jak je
znázorn
ěno.
9-3: Kladka 6 je namontována v rohu hlavní-
ho sloupku mezi desky horního nosníku (22)
pomocí šroubu M10*45, jak je znázorn
ěno.
9-4: Kladky 7 a 8 jsou instalovány uvnit
ř 3”
kulaté trubky hlavního sloupku. Kladka 7 je
nad kladkou 8 a jsou instalovány s 1” stup-
ňovými rozpěrkami (46), jak je znázorněno
na obou stranách
trubky.
Содержание INSPIRE M5
Страница 1: ...U ivatelsk n vod...