![Hamilton Manufacturing Corporation Token Vendor Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/hamilton-manufacturing-corporation/token-vendor/token-vendor_operational-manual_3422916011.webp)
Document #101-0163
11
1/10/06
ACW G/L Retrofit
Upgrade the Gold Line to run Hamilton Token Vendor.
1.
Turn off power to machine at source.
2.
Remove the two #8/32 hex nuts holding the Distribution pan cover and cover channel on.
3.
Remove the two #8/32 hex nuts and coupling nut (depending on when machine was produced it
may be a mounting stud) holding the Relay pan cover with High Voltage Sticker on it.
4.
Remove the two mounting studs or coupling nuts holding the relay pan . One is at the top of the
relay panel and the other is located at the bottom. Lay relay panel in bottom of machine.
5.
Disconnect the hopper harness from position # 5 on distribution board.
6.
Plug Hamilton Token Vendor ACW G/L harness (48-3187) into position # 5 on distribution board.
7.
Plug Original harness into connector on Hamilton Token Vendor ACW G/L harness.
8.
Run both the Hamilton Token Vendor harness and original harness down the channel on right side of
relay pan.
9.
Reattach relay pan to cabinet by reusing the mounting hardware. ( Note: making sure you do not
pinch any of the wires.)
10.
Connect the wires with the spade terminals to relay pan terminals
Orange wire to position B3
Red wire to position B4
Orange/white to position B5
Note: If you are currently using these terminal for another application, you will not be able to use it.
Those terminals will be dedicated for the Hamilton Token Vendor only.
11.
Connect wires from ACW G/L to the Hamilton Token Vendor connecting wires as color coded. (
Red to Red, Purple to Purple …)
Note: For proper wire connections consult a certified electrician.
12.
Replace the Distribution pan and channel cover on the relay pan covering wire connections by
reusing the mounting hardware.
13.
Replace Distribution pan cover by reusing mounting hardware.