8
OVLEREEQ*G OVLSREEQ*G OVLESREEQ*G OVLSEREEQ*G
97882C - (REV. A - 8/04)
7.
Install fountain.
Remove bottom access panel on
underside of fountains and
SAVE
the screws. Mount
the fountains to the upper panel and frame with
(4) 5/16 x 3/4 (19mm) long bolts and nuts provided.
Tighten securely.
Note:
With OVL-II SEREE-Q or OVL-II ESREE-Q models, the
standard reach fountain must be mounted at the
upper position on panel.
Figure 14 Fountain Installation
Figure 13 Upper Panel Installation
8.
Connect the fountain drain waste tube to the building
sanitary sewer system.
Connection should be made in
compliance with local plumbing code requirements. (Note:
Plumbing trap is not included with the fountain).
9.
Make connection between solenoid valve assembly
and fountain(s).
Insert the 1/4 poly tubing coming from the
fountain with sensor into the solenoid valve. Insert the 1/4
poly tubing coming from the fountain with push button into
the tee (See Figs. 17 & 18).
10.
Connect power cord of sensor to solenoid valve by
running it through the back panel and connecting it
as shown in Fig. 26.
Connectors may be connected to
either terminal on solenoid valve. Attach ground wire to
solenoid valve bracket with green ground screw.
3.
Attach solenoid valve assembly to the underside of
cross member of mounting frame on electronic
sensor unit.
(See Fig. 7).
4.
Make water supply connections.
Inlet port is marked on
the chiller (1/4 O.D. copper tube). Bend the copper tube
(provided) at an appropriate length from the chiller to opening
in frame. Install the in-line strainer (provided with chiller) by
pushing it in until it reaches a positive stop, approximately
3/4 (19mm) on the marked chiller inlet port (See Figs. 17 &
18). Attach an unplated and deburred copper water inlet line
and a service stop (not provided) to the chiller. Turn on the
water supply and flush the line thoroughly.
5.
Make connection between remote chiller outlet tube
and solenoid valve assembly.
Outlet port is marked on
the chiller (1/4 O.D. copper tube). Install a 1/4 union/tee
(provided) on the marked chiller outlet port. Insert one end of
1/4 poly tubing into the union/tee and the other end into the
straight fitting on the solenoid valve assy (See Figs. 17 & 18)
6.
Hang the upper panel on the mounting frame hange
r.
Align holes in the panel with the holes in the mounting frame.
Be sure that panel is engaged with hanger at top of frame
before releasing it.
Special Tools
Item
Description
Quantity
None
Item
Description
Quantity
Additional Materials
1
Unplated copper inlet pipe
Quantity
REQUIRED TOOLS AND MATERIALS
These tables show special tools and/or additional materials (not
provided) which are necessary to complete installation of these
units:
OVL-II EREE-Q/SREE-Q/SEREE-Q/ESREE-Q
INSTALLATION
1.
Assemble and
place frame in wall as shown on preceding
pages.
2.
Install chiller:
Remove front panel of chiller.
Remove and
discard cardboard inner pack from between
compressor and side panel.
Slide chiller onto the shelf
and position it to the left on the shelf.
NOTE:
Building construction must allow for adequate air
flow on both sides, top and back of chiller. A
minimum of 4 (102mm) on both sides and top is
required. See chiller installation for additional
instructions.
2
Service Stop
Quantity
Figure 12 Chiller Installation