background image

8

OVLEREEQ*G  OVLSREEQ*G  OVLESREEQ*G  OVLSEREEQ*G

97882C - (REV. A - 8/04)

7.   

Install fountain.

 Remove bottom access panel on

      underside of fountains and 

SAVE

 the screws. Mount

       the fountains to the upper panel and frame with

       (4) 5/16” x 3/4” (19mm) long bolts and nuts provided.

       Tighten securely.

Note:

  With OVL-II SEREE-Q or OVL-II ESREE-Q models, the

           standard reach fountain must be mounted at the

           upper position on panel.

Figure 14 – Fountain Installation

Figure 13 – Upper Panel Installation

8.

Connect the fountain drain waste tube to the building

sanitary sewer system.

 Connection should be made in

compliance with local plumbing code requirements. (Note:

Plumbing trap is not included with the fountain).

9.

Make connection between solenoid valve assembly

and fountain(s).

 Insert the 1/4” poly tubing coming from the

fountain with sensor into the solenoid valve. Insert the 1/4”

poly tubing coming from the fountain with push button into

the tee (See Figs. 17 & 18).

10.

Connect power cord of sensor to solenoid valve by

running it through the back panel and connecting it

as shown in Fig. 26.

 Connectors may be connected to

either terminal on solenoid valve. Attach ground wire to

solenoid valve bracket with green ground screw.

3.

Attach solenoid valve assembly to the underside of

cross member of mounting frame on electronic

sensor unit. 

(See Fig. 7).

4.

Make water supply connections.

 Inlet port is marked on

the chiller (1/4” O.D. copper tube). Bend the copper tube

(provided) at an appropriate length from the chiller to opening

in frame. Install the in-line strainer (provided with chiller) by

pushing it in until it reaches a positive stop, approximately

3/4” (19mm) on the marked chiller inlet port (See Figs. 17 &

18). Attach an unplated and deburred copper water inlet line

and a service stop (not provided) to the chiller. Turn on the

water supply and flush the line thoroughly.

5.

Make connection between remote chiller outlet tube

and solenoid valve assembly. 

Outlet port is marked on

the chiller (1/4” O.D. copper tube). Install a 1/4” union/tee

(provided) on the marked chiller outlet port. Insert one end of

1/4” poly tubing into the union/tee and the other end into the

straight fitting on the solenoid valve assy (See Figs. 17 & 18)

6.

Hang the upper panel on the mounting frame hange

r.

Align holes in the panel with the holes in the mounting frame.

Be sure that panel is engaged with hanger at top of frame

before releasing it.

Special Tools

Item

Description

Quantity

None

Item

Description

Quantity

Additional Materials

1

  Unplated copper inlet pipe

Quantity

REQUIRED TOOLS AND MATERIALS

These tables show special tools and/or additional materials (not

provided) which are necessary to complete installation of these
units:

OVL-II EREE-Q/SREE-Q/SEREE-Q/ESREE-Q

INSTALLATION

1.

Assemble and

 place frame in wall as shown on preceding

pages.

2.

Install chiller:

 Remove front panel of chiller. 

Remove and

discard cardboard inner pack from between

compressor and side panel.

 Slide chiller onto the shelf

and position it to the left on the shelf.

NOTE:

Building construction must allow for adequate air

flow on both sides, top and back of chiller. A

minimum of 4” (102mm) on both sides and top is

required. See chiller installation for additional

instructions.

2

  Service Stop

Quantity

Figure 12 – Chiller Installation

Содержание OVL-II-EREE-Q

Страница 1: ...talled unit for future reference Service to be performed by authorized service personnel only INSTALLER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit which results in an electrolysis effect occurring in the fountain This may result in water which has...

Страница 2: ...lex option Bubbler Gasket Strainer Plate S S Strainer Plate A G Drain Gasket Packing Ring Drain Nut Friction Ring Drain Plug S S Drain Plug A G Drain Tube Drain Tube Waste Tube Gasket Slip Nut Regulator W Red Spring Regulator W Green Spring Regulator Holder Basin S S Basin A G Basin Liner S S Basin Liner A G Screw 8 18 x 37 Top Plate Actuator Bottom Plate Actuator Extended Reach Arm EE S S Extende...

Страница 3: ...EE A G Lower Panel OVL II EREE SREE S S Lower Panel OVL II EREE SREE A G Lower Panel OVL II SEREE ESREE S S Lower Panel OVL II SEREE ESREE A G Strainer Supplied with Chiller Union 1 4 Tee 1 4 Poly Tubing 1 4 Cut To Length Bubbler Nipple Assembly Regulator Mounting Bracket Solenoid Valve Assy Power Cord Sensor Clear Hex Nut Unplated Strain Relief Bushing Snap Bushing 50 I D Spacer Regulator Nut Hex...

Страница 4: ... up to 150 lbs static load and provide a means for securing the frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit a minimum of 4 102 mm is required 3 Install plumbing and electrical rough ins A junction box for a 3 wire 10 amp branch circuit is provided on the inside of the chiller Standard 120 Volts 60 Hz and single ph...

Страница 5: ...with frame upright support edges flush with the finished wall face Secure the frame to the wall through holes with 12 5 16 bolts or screws not provided Tighten securely NOTE Be sure that frame is squared in location Do not use less than required screw quantity and size 6 Attach the chiller shelf support rods to the right side of the frame uprights at the second set of holes counting from the botto...

Страница 6: ...orce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit Minimum of 4 102 mm is required 3 Install plumbing and electrical rough ins A junction box for a 3 w...

Страница 7: ...o the bottom of wall opening Secure the frame sides and top to the wall opening using 10 5 16 bolts or screws not provided NOTE Be sure that frame is squared in location Do not use less than the required screw quantity and size MODEL OVL EREE MODEL OVL SREE Legend Item Description A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 O D Waste Tube D Electrical Inlet...

Страница 8: ...strainer provided with chiller by pushing it in until it reaches a positive stop approximately 3 4 19mm on the marked chiller inlet port See Figs 17 18 Attach an unplated and deburred copper water inlet line and a service stop not provided to the chiller Turn on the water supply and flush the line thoroughly 5 Make connection between remote chiller outlet tube and solenoid valve assembly Outlet po...

Страница 9: ...l lower stream height For Electronic sensor units only remove bottom access panel and turn adjustment screw on the regulator Item 14 Figs 25 27 Clockwise adjustment will raise stream height and counterclockwise movement will lower stream height For best adjustment stream height should be approximately 1 1 2 38mm above the bubbler guard See Figure 16 15 Mount lower panel Loosen the two 2 10 24 x 5 ...

Страница 10: ...ulator Assembly 19 2 20 29 30 31 23 25 27 26 Stream Height Adjustment Sensor Control The sensor has a 2 second delay time If sensor fails to operate valve mechanism or operates erratically check the following a Ensure there are no obstructions within a 40 inch radius from the front of fountain b Check wire connections at the solenoid valve and at the sensor CAUTION Make sure unit is unplugged befo...

Страница 11: ... OVLSREEQ G OVLESREEQ G OVLSEREEQ G 97882C REV A 8 04 Figure 23 Push Bar Fountain Assembly Figure 24 Push Bar Fountain Assembly Side View 3 4 16 17 32 5 10 22 6 7 8 9 13 11 8 12 33 See Fig 22 1 See Fig 20 See Fig 21 ...

Страница 12: ...R LOCAL DISTRIBUTOR OR VISIT OUR WEBSITE WWW HALSEYTAYLOR COM Figure 25 View of Electronic Sensor Figure 26 View of Solenoid Valve Figure 27 Electronic Sensor Fountain Assembly Side View Connect To Sensor Assy 38 3 4 45 41 40 50 49 51 21 48 42 46 1 44 39 32 33 5 15 14 47 43 12 13 11 9 8 7 6 10 8 REPAIR SERVICE INFORMATION TOLL FREE NUMBER 1 800 260 6640 ...

Отзывы: