Local Mode Operation 

 

To enter the Local mode, toggle the Remote/Local switch to the right.  While in the Local mode, the 
operator can perform manual calibrations and blowback. 

 
The flow control drawer is in Local Control when the Local Switch is selected, the red LED is on and 
the green Sample LED is on as well. In this mode, all switches on the front panel are enabled for 

local operator control and Computer Control is disabled. All Calibration Gas (CG) functions, 
Direct/System, and blowback are available for the local operator.  When the Local LED is OFF, the 

PC or PLC has control and can remotely duplicate local control functions. The Local Switch provides 
an output to the PLC/PC to indicate that the Flow Control Drawer is offline, (i.e., the analyzers’ 

outputs are not reliable). 
 

CONTROL FUNCTIONS: 
 
Switches Sample 

Blowback 

Direct 

Calibration 

System 

Calibration 

Local  

Direct  

 

 

System     X 
Blowback  X    
Cal Gas 1-8 

 

 

 

Manual System Calibration:

 To perform manual system calibration, toggle the Direct/System switch 

to the right. Then toggle any of the Calibration Gas switches to the right. This will allow the 

selected calibration gas to flow to the analyzer suite via the total sampling system. In this mode, 
manual blowback is not allowed. 
 

Manual Direct Calibration: 

To perform manual direct calibration, toggle the Direct/System switch to 

the left. Then toggle any of the Calibration Gas switches to the right.  This will allow the selected 

calibration gas to flow to the analyzer suite directly, bypassing the total sampling system. In this 
mode, manual blowback is allowed. 

 

Manual Blowback: 

To perform manual blowback, depress the Blowback switch to the right. This 

switch is a momentary switch, that is, it will return when released.  When the operator toggles the 
Blowback switch, two things happen; first, the blowback relay will be activated, and second, the 
direct solenoid valve will be activated. With the direct solenoid valve activated, the analyzer suite 

will be protected from blowback pressurization. 
 

Computer Control Mode Operation 

 

Computer Control (CC):

 To enter Computer Control mode operation the Remote/Local switch must 

be toggled to the left. Computer control is initiated through the 16 Position vertical terminal block 

on the back panel. To activate a particular function, 5VDC is applied to the appropriate terminal.  
The Remote and Local functions are identical. This can be done in one of two ways. The first way is 
to take the +5 VDC from terminal 10 or 12, pass it through a set of dry contacts on a computer 

controlled relay, and back to the appropriate terminal. The second way is to take +5VDC directly 
from the computer control to the appropriate terminal. For this method, please note that the flow 

control drawer GND on Terminal 14 and 16 must be connected to the GND on the computer control 
unit, to electrically reference both systems together.  

 

Содержание PERMA PURE Baldwin Series

Страница 1: ...LC 732 244 0010 800 337 3762 fax 732 244 8140 www permapure com info permapure com PERMA PURE LLC 8 Executive Drive P O Box 2105 Toms River NJ 08754 Baldwin Series Model 3300 3300P Flow Control Drawer User s Manual ...

Страница 2: ...oard Option 7 Local Mode Operation 8 Computer Control Mode Operation 8 Computer Control Terminals Summary 9 Computer Sense Terminals Summary 9 COMPUTER CONTROL TRUTH TABLE 10 Pressure Sensor Model 3300P 10 Troubleshooting and Maintenance Guide 11 Replacement parts 12 Appendix A Flow Control Drawer Drawings 13 A1 Panel drawing 13 A2 Flow schematic 13 Appendix B Warranty and Disclaimer 14 Appendix C...

Страница 3: ...lly a carrier must be notified within 24 hours of the delivery to make a hidden damage claim Items in the carton include 1 Model 3300 Flow Control Drawer 1 User s Manual If any of the above parts are missing or damaged call the helpline at 800 337 3762 ext 145 Introduction Thank you for purchasing this product from Perma Pure LLC This manual has been assembled so that it can answer all questions r...

Страница 4: ...w to the stack filter head and through the entire sample system to the calibration gas introduced directly to the continuous gas analyzer common sample manifold This check indicates problems such as system leakage and gas component loss Features Manual or PLC control of sample calibration gases Up to 6 gas analyzer channels Up to 8 cal gas channels including zero and span Multiple flow meters cal ...

Страница 5: ...back Specify 12 VDC line voltage or dry contact Electrical requirements 90 240 VAC 50 60 Hz 100 watts Connections refer to Appendix A3 for back panel drawing 1 All Sample Gas Connections are via 1 4 stainless steel bulkhead fittings 2 All Calibration Gases are 1 4 SS Tube Quick Connects 3 All Bulkhead Connections are labeled and follow the following functions Sample In SAMPLE Sample Vacuum Sense I...

Страница 6: ...red prior to operation Electrical current may be present behind covers or doors even if tools are not necessary to access these components NEVER attempt service on this equipment without first disconnecting all energy sources Repair of this equipment should only be done by properly trained personnel that are familiar with the potential risks involved with servicing of the equipment NEVER replace f...

Страница 7: ...n gas solenoid valve and either the system solenoid valve or direct solenoid valve have been selected In Local mode the calibration gas solenoid valves are cascaded that is if there are more than one 1 calibration gas solenoid valve switches in the on position only the highest numerical calibration gas solenoid valve will be active This is not the case with computer control The programmer can sele...

Страница 8: ...t calibration toggle the Direct System switch to the left Then toggle any of the Calibration Gas switches to the right This will allow the selected calibration gas to flow to the analyzer suite directly bypassing the total sampling system In this mode manual blowback is allowed Manual Blowback To perform manual blowback depress the Blowback switch to the right This switch is a momentary switch tha...

Страница 9: ...long with the computer control mode of operation a computer verification method is also incorporated into the system A 40 pin vertical terminal block on the back panel allows the computer to verify the actions initiated by the computer This is done through a set of normally open dry contacts that are associated with each particular function Computer Sense Terminals Summary FUNCTION TERMINALS Cal G...

Страница 10: ...on 7 Direct Calibration 8 Blowback D Disabled Pressure Sensor Model 3300P The pressure sensor option provides Vacuum pressure sensor 0 15 psig Sample pressure sensor 0 30 psig Calibration gas pressure sensor 0 30 psig Outputs 1 The standard output from all sensors is 4 20 mADC isolated loop powered 1 2 Outputs are terminated on the Flow Control Drawer back panel on the analog output Pressure Trans...

Страница 11: ...ttle Cal gas solenoid not operating Flow drawer regulator set 10psig Cal gas Flowmeter closed Block bleed solenoid constantly vents System cal gas solenoid valve defective Direct cal gas solenoid valve defective Select local Adjust sample pressure Cylinder to 15 psig Check cabling Replace cal gas solenoid Replace control board Set regulator to 10 psig Adjust Flowmeter Replace solenoid SV9 Replace ...

Страница 12: ...B 001 2 way solenoid valve 12 VDC 2VSB 002 3 way solenoid valve 12 VDC 2FTS 021 Cal Gas connector 3DCB 006 Circuit board switch board FCD 4D 3300P 2FTS 021 Cal Gas connector 3DCB 006 Circuit board switch board FCD 2FIV 003 Flow meter 0 1 10 LPM w valve 2FIN 002 Flow meter 0 1 10 LPM no valve 2FIV 005 Flow meter 0 2 2 5 LPM w valve 1PSD 032 Power supply 100W 12VDC 2GAP 006 Pressure gauge 2 1 2 dia ...

Страница 13: ...OPYRIGHT 2008 ALL RIGHTS RESERVED Original Instructions PERMA PURE LLC Model 3300 User s Manual Doc 532 Revision 000 Page 13 of 14 Appendix A Flow Control Drawer Drawings A1 Panel drawing A2 Flow schematic ...

Страница 14: ...be suitable or desirable for any particular use or application 2 Buyer takes sole responsibility for the use and applications to which the product is put and Buyer shall conduct all testing and analysis necessary to validate the use and application to which Buyer puts the product for which Buyer may recommend the use or application of the product by others and 3 the characteristics specifications ...

Страница 15: ... Form C contact 1 Amp 2 Outputs are terminated on the Flow Control Drawer back panel on the Pressure Transducer Terminal Strip Connections N O Common N C Vacuum Pin 11 Pin 12 Pin 13 Sample Pin 14 Pin 15 Pin 16 Calibration gas Pin 17 Pin 18 Pin 19 Sensor Calibration All switches are set to mid scale at the factory The flow drawer lid must be removed for access the switches for adjustment Interior o...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Отзывы: