
10
First Operation
2
First Operation
2.1
Instruction
Instruction is required before first ope-
ration. First instruction into handling of
the machine must be held by a qualified
person sent by your local Hako contract
dealer. Your Hako dealer will be infor-
med by the manufacturer upon delivery
of the vehicle and will contact you to
make a date for instruction.
2.2
Initial charging procedure
Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the
operating instructions of the
charger as well as with those of
the battery manufacturer.
Hako cannot be held liable for
damages resulting from an in-
sufficient initial charge.
2.3
Before Putting into Operation
Complete the following inspections be-
fore taking the machine into operation:
1. Check the area around the machine
for signs of leakage. Hoses, lines
and tanks must be free from any lea-
kage or damage.
2. Install brushes and squeegee, see
maintenance chapter.
3. Install batteries and connect battery
plug, see maintenance chapter.
4. Check battery charge and proceed
to re-charging of batteries if required.
Generally proceed to initial charging
before first operation of the machine.
5. Empty recovery tank and clean it if
required, see maintenance chapter.
6. Re-fill solution tank and add cleaning
agent according to the manufactur-
er's recommendations.
Use only cleaning agents sui-
table for automatic machines
(low-foaming) and comply with
the instructions for use, dispo-
sal and with the warning infor-
mation specified by the cle-
aning agent's manufacturer.
2.4
Start Machine
Before start of the machine,
leave accelerator level to neu-
tral position.
Proceed with the following to set the
machine into operating mode:
• Disconnect mains plug of the char-
ger from outlet and fasten to holder.
• Switch on machine by actuation of
key switch from position (0) to positi-
on (1).
10
First Operation
2
First Operation
2.1
Instruction
Instruction is required before first ope-
ration. First instruction into handling of
the machine must be held by a qualified
person sent by your local Hako contract
dealer. Your Hako dealer will be infor-
med by the manufacturer upon delivery
of the vehicle and will contact you to
make a date for instruction.
2.2
Initial charging procedure
Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the
operating instructions of the
charger as well as with those of
the battery manufacturer.
Hako cannot be held liable for
damages resulting from an in-
sufficient initial charge.
2.3
Before Putting into Operation
Complete the following inspections be-
fore taking the machine into operation:
1. Check the area around the machine
for signs of leakage. Hoses, lines
and tanks must be free from any lea-
kage or damage.
2. Install brushes and squeegee, see
maintenance chapter.
3. Install batteries and connect battery
plug, see maintenance chapter.
4. Check battery charge and proceed
to re-charging of batteries if required.
Generally proceed to initial charging
before first operation of the machine.
5. Empty recovery tank and clean it if
required, see maintenance chapter.
6. Re-fill solution tank and add cleaning
agent according to the manufactur-
er's recommendations.
Use only cleaning agents sui-
table for automatic machines
(low-foaming) and comply with
the instructions for use, dispo-
sal and with the warning infor-
mation specified by the cle-
aning agent's manufacturer.
2.4
Start Machine
Before start of the machine,
leave accelerator level to neu-
tral position.
Proceed with the following to set the
machine into operating mode:
• Disconnect mains plug of the char-
ger from outlet and fasten to holder.
• Switch on machine by actuation of
key switch from position (0) to positi-
on (1).