13. Remove all people from the area before you start lifting the load. Do not allow any
people to stand under the moving load.
14. Make sure you have a full visual view on the complete travel path of the load.
15. Lift the load to the required height.
DE-RIGGING THE HOIST:
1. Check the direction of travel. If the pre-selection switch on the controller is in the down-direction the
chain hoist should run in down-direction.
2. Check if both the lifting directions work properly (lifting and lowering).
3. Remove all people from the area before you start lowering the load. Do not allow
any people to stand under the moving load.
5. Make sure you have a full visual view on the complete travel path of the load.
6. Bring the load down until within reach for further dismantling.
7. Remove all parts of the load and slings attached the chain hook.
8. Disconnect the power and control cables.
9. Remove the chain hoist from the suspension structure and bring it down.
10. Put the chain hoist and the chain bag in their compartments of the flight case
(when applicable).
11. Remove any bracket, beam clamp or sling from the main structure elements.
5.2.3 Continuous rating
Never use the hoist beyond the permitted 24 minutes per hour.
The lifetime of the hoist depends on the conditions of the load and working frequency. During long operating
periods make sure to use the hoist within its continuous rating.
Continuous rating means the amount of allowable usage within one hour which is 40% or 24 minutes per hour
or 300 starts per hour.
The maximum number of starts means the number of times the motor starts within the hour.