INSTALLATION OF THE LIFT TABLE ON THE FLOOR/GROUND OR IN A PIT
Double or triple vertical scissors tables must be fixed to the floor/ground
by means of expander bolts or
similar, we also recommend that all other
lift table types, with the exception of mobile units, are securely affixed on
the floor to prevent unintentional movement.
MECHANICAL/ELECTRICAL INSTALLATION
1. The base frame of the lift table is not as standard self-supporting. It is important that the
flooring is flat and stable and that the installation area or pit, when necessary, is well
drained.
2. Utilize a lifting sling through the scissor package. Tie the base frame to the platform or the
scissor mechanism. Locate the table into the desired position. Turn the fixed arm end to the
side where the load will be moved on or off at upper level. See picture below.
3. Check the operation of the safety frame on all sides.
4. The control device should be positioned so that the operator has a clear view over the lift
table and the load at all times when the lift is operated.
Pit drawing
A. Pit length=a+30mm
B. Pit width=b+30mm
H. Pit depth=closed height of table+5mm
a. Platform length
b. Platform width
c. Drainage hole (when required)
d. Tube for external cables and hoses φ60mm
h. Lowest height
Loading/unloading at the fixed arm end