HAKKEN SPN-202Ui Скачать руководство пользователя страница 7

-5-

 

 WARNING

 

 

15. Do not use the Core Bit which exceeds the maximum diameter of Core Bit.

 

16. Connection for water supply must be ensured. 

◎ 

Water might be splashed to the electric tool or person in working area. 

17. In case that Pole Base is fixed, ensure to fix it at stable place. 

18. If accessories are broken, don’t use it. Repair or replace. 
19. Check the Core Bit, tube and coupling with no crack, tipping or deformation by visual 

confirmation. In addition, check the excessive wearing at edge of Core Bit or part of 
shank. If there is any abnormal things, never use Core Bit. 

20. If the cutting performance becomes lower, do dressing. If you use lower performance 

Core Bit, it becomes high temperature and break, then there is possibility to get injured. 

◎ 

Drill to rough grind stone or soft cutting material. (Concrete block, brick, or grind stone) 

21. Be sure to switch off Core Drill before pressing Green on Button of PRCD. 

 

 

 CAUTION

 

 

1. Do not overload with Core Drill.

 

  Use the machine according to the machine capacity of specifications in order to use safely 

and efficiently. 

2. When drilling, please supply the water for sure.

 

  Overheating of Core Bit reduces not only  drilling performance but also its life. So make 

sure to keep supplying water during drilling operation. 

  Use clean water only. Using the dirty water may cause machine failure.

 

3. Do not turn on the motor with Core Bit facing to the drilling surface.

 

  It causes the damages for Core Bit and Core Drill. 

4. When starting the 

drilling

, please wait until the rotating is increased.

 

  Regarding the drilling work, turn the switch on and wait until the rotating is increased fully. 

5.  Do  not  stop  rotating 

of

  Core  Bit  by  forcing  the  power  on  the  feeding  handle  during 

drilling, and do not lock the Core Bit.

 

  It might cause the damages for the chip of Core Bit and Core Drill. 

6. 

When

 releasing your hands from the feeding handle, please make sure that Lock 

Dial is tighten, then, fix the Drill Head.

 

  When loosening Lock Dial, please hold the feeding handle in order not to move the Drill 

Head.

 

7. Before starting operation, 

test

 PRCD in the following procedures.

 

  Plug Power Cord and press Green on Button. Make certain Red Lamp is on. 

  Press Blue TEST Button and make certain Red Lamp is off.

 

  Press Green on Button again and make certain Red Lamp is on

.

 

 

 

 

 

Содержание SPN-202Ui

Страница 1: ...02Ui INSTRUCTION MANUAL Thank you for purchasing our products Before using please read Instruction manual carefully and use the machine safely by following the instructions After reading please keep it where anyone can utilize ...

Страница 2: ...TION The instruction manual includes two signal words WARNING CAUTION which are meant as follows WARNING It is assumed that if the user uses the machine wrongly it would be the risks that the user could be died or injured CAUTION It is assumed that if the user uses the machine wrongly it would be the risks that the user could remain the disabled or damage for the materials CAUTION might cause the ...

Страница 3: ...CIFICATIONS 8 4 STANDARD ACCESSORIES 8 5 APPLICATIONS 8 6 GENERAL DRAWING AND SPECIFICATIONS IN OPERATION 9 7 OPERATIONAL INSTRUCTIONS 1 Anchoring Core Drill 10 2 Anchoring Core Drill by Anchor Bolt 10 8 MAINTENANCE AND SERVICING 1 Maintenance 12 2 Regular Servicing 12 9 FOR REPAIRING 15 10 INFORMATION ON NOISE EMISSIONS 15 11 WARRANTY 15 12 CE DECLARATION OF CONFORMITY 16 ...

Страница 4: ... Wear cap or hair cover in case that you have long hair 5 Wear ear protector such as earplug or ear muffs Wear ear protector in the place of noise 6 Wear safety glasses Wear safety glasses during working If there is dust please wear the dust mask 7 Do not work with improperly posture Fix the footing and maintain the balance at all times 8 Work carefully without staying alert When using the electri...

Страница 5: ...tch please make sure that the key and the wrench which are used for the inspection and adjusting are removed 15 The electric machines are maintained carefully Regarding exchanging the options please follow the instruction Keep the grip dry and clean and avoid the oil or grease Inspect the cord regularly In case that there are damages please contact to the distributors or CONSEC for repairing In ca...

Страница 6: ...hen please start operating 6 Use the proper voltage which is indicated on the nameplate In case that you apply for the voltage which is over the indicated voltage it will cause the accidents 7 Fix the Pole Base properly It is extremely important to fix the pole base securely If it is not fixed securely the Core Bit might be damaged by rattling of Core Drill or jammed 8 Use the Water Collector for ...

Страница 7: ...afely and efficiently 2 When drilling please supply the water for sure Overheating of Core Bit reduces not only drilling performance but also its life So make sure to keep supplying water during drilling operation Use clean water only Using the dirty water may cause machine failure 3 Do not turn on the motor with Core Bit facing to the drilling surface It causes the damages for Core Bit and Core D...

Страница 8: ...le Base After combining with Drill Carriage and Pole Base the distributor must make a CE marking and issue CE DECLARATION OF CONFORMITY 2 Drill Carriage Assy and Pole Base which are mounted on Drill Motor must have capacity of specified Max drilling diameter or larger capacity If combined with Drill Carriage Assy and Pole Base which have lesser capacity Drill Motor cannot function fully and this c...

Страница 9: ...Standard Accessories Motor Water Cock Switch Built in Circuit Breaker Carbon Cap Name Plate Feeding Handle Unified screw 1 1 4 7 UNC The outside of Main Shaft Lock Dial 247 328 PRCD Cord 2 4m Clamp Adjust Bolt Hex Socket Set Screw Grip G 1 2 The inside of Main Shaft 419 ...

Страница 10: ...ing cord 11 3kg Max Burst Pressure Hose 3 9MPa 4 STANDARD ACCESSORIES Hose Band 00 1 Hose 12 250 1 Water Cock 1 4 Gardena 1 Hex Bar Wrench 4mm 1 Instruction Manual 1 5 APPLICATIONS This tool is Core Drill for drilling in concrete Core Drilling in concrete for road dam tunnel and bridge construction Sampling test pieces Core Drilling of pilot hole for guard rail post and fence post Core Drilling in...

Страница 11: ...ECIFICATIONS IN OPERATION Drill Head installed on to 49 Pole Base Drill Motor Feeding Handle Core Bit Water Collector 49 Drill Carriage Assy Bolt Square Washer Hex Nut Leveling Bolt Water Collector Fitting Drill Head 49 Pole Base ...

Страница 12: ...o as to align main shaft with the hole to be drilled 5 Adjust leveling with leveling bolts so as to eliminate rattling of pole base After completion of adjustment secure leveling bolt with wing nut 6 Tighten hex nut to secure Pole Base 3 Installation of Core Bit Thread Core Bit onto main shaft 4 Installation of Water Collector Secure Water Collector with Water Collector Fitting WARNING Be sure to ...

Страница 13: ...ontact with work surface While starting to drill apply light pressure on feeding handle until drill bit penetrates to 5 10mm depth Then keep drilling under uniform pressure WARNING 1 If motor is switched on with Core Bit contacts on the work surface it causes Core Bit fracturing or Core Drill failure resting in hazardous accidents 2 Wait until the rotation of Core Bit increases to the full and the...

Страница 14: ...d with the soapy water 2 Maintenance for motor After entire operation is over secure Drill Head onto Pole Base run motor with no load and remove dirt and dust from motor interior 2 Regular Servicing 1 Checking of carbon brush 1 How to check Remove Carbon Brush Cap using flathead screw driver etc and take Carbon Brush out After replacement secure carbon cap 2 Item to be checked If the wearing of th...

Страница 15: ... feeding handle gets heavy When slide plate is worn and starts to rattle replace it 3 Checking and adjustment of clutch As Friction Plates wear out the clutch becomes easy to slip When this happens readjust the clutch using clutch adjusting tools 1 Remove Hex Socket Cap Plug 1 8 from Gear Case by Hex Bar Wrench 5mm 2 Insert the tip of Clutch Adjusting Pin into the hole where the plug 1 8 is remove...

Страница 16: ...t is locked Turn the motor switch on for just a moment and make sure that the clutch is slipping without motor locking WARNING Be careful for the position of Single ended Wrench 36mm touching on pole See the drawing 6 After making sure the clutch is slipping install Hex Plug 1 8 back into the hole 4 Checking of attaching screws Check every attaching screws for loosening periodically If found loose...

Страница 17: ...ments at a distance of 1 meter from the surface of the machinery and at height of 0 8 meter from the floor during no load operation 11 WARRANTY We will guarantee the HAKKEN Core Drill SPN 202Ui for 6 months from the date of delivery During this period we will rectify material and production defects free of charge We are not responsible for any other damage direct nor indirect other than this This ...

Страница 18: ...PN 202Ui Council Directive 2006 95 EC 2004 108 EC 2006 42 EC Relative Standard EN292 1 EN292 2 EN55014 1 EN55014 2 EN61000 3 2 EN61000 3 3 EN61000 4 2 EN61000 4 4 EN61000 4 5 EN61000 4 6 EN61000 4 11 EN61029 1 EN61029 2 6 Year To Begin Affixing CE Marking 2013 Place Hiroshima Japan Signature Name Hidetaka Sasaki Title President Date July 2013 The documentation referred herein is retained in our au...

Страница 19: ... 17 MEMO ...

Страница 20: ... 18 Main office 4 6 8 Shoko Center Nishi ku Hiroshima 733 0833 Japan International Department 1 7 5 1 Sakaimachi Naka ku Hiroshima 730 0853 Japan Phone 81 82 297 3231 Fax 81 82 297 3230 E1940 1 ...

Отзывы: