HAKKEN SPN-202Ui Скачать руководство пользователя страница 6

-4-

 

 

2

Notes for Usage of Core Drill 

(In case of combination with CONSEC's original Drill Carriage Assy. and Pole Base.)

 

 WARNING

 

 

1. Check for the embedded conduit etc.

 

  In case that you contact to the electric wire or conduit in that there are electric current, you 

may receive the electric shocks. 

  Before drilling the wall or the floor, check for the embedded conduit etc adequately.

 

2. Be sure to wear the rubber gloves and the rubber shoes.

 

  Since this machine uses the water, be sure to wear the rubber gloves and the rubber shoes. 

3. Do not use for the ceiling plane.

 

  Since the Core Drill is used the water, it is extremely dangerous to drill for the ceiling plane 

due to flowing the water into the inside of motor. 

4. Regarding the operation of high-place work, please follow the applicable laws and regulations .

 

  Secure the safe scaffold, and do not operate the machine 1.5m higher than the scaffold. 

  In case that you work at high place, secure the enough scaffold space and secured scaffold.

 

  In case that you work at high place, keep any person away under your working area.

 

5. Be careful for the safety of the penetration side.

 

  When drilling for the penetration, cutting Core Bit might fall out or the cutting water might 

be leaked. Therefore, please do the safeguard and the drain water handling in order not to 
avoid to hit the human beings or objects. Then, please start operating. 

6. Use the proper voltage which is indicated on the nameplate.

 

  In case that you apply for the voltage which is over the indicated voltage, it will cause the 

accidents. 

7. Fix the Pole Base properly.

 

  It is extremely important to fix the pole base securely. If it is not fixed securely, the Core Bit 

might be damaged by rattling of Core Drill or jammed. 

8. Use the Water Collector for sure.

 

  Use Water Collector pad for sure in order to avoid the water flowing into the inside of motor 

by flying apart the water during operation. 

  When using Water Collector, please install it adequately in order not to leak the water. 

9. Do not contact to the rotating Core Bit and Main Shaft.

 

  Do not contact your hands and body to the rotating Core Bit and Main Shaft. It might be 

caught in or injured.

 

10. Do 

not

 block the air hole of motor, and do not put the materials into the air hole.

 

11. Turn the switch off immediately if any abnormality is found. 

  When the Core Bit stops or you hear the strange noise during the operation, please turn 

switch off immediately.

 

12. In case that you use Vacuum Pad for fixing the Pole Base, please do not use the Automatic 

Feeding System.

 

  The Pole Base comes up, and it is extremely dangerous. 

13. Asbestos is the harmful to human beings. In case that you drill containing such materials, 

please follow the applicable laws and regulations, and take a measure for dust control.

 

14. Do not use the Core Bit which has a outshoot. 

  If the rotating objects has a outshoot, it might be the risk for being caught in or injured.

 

 

 

Содержание SPN-202Ui

Страница 1: ...02Ui INSTRUCTION MANUAL Thank you for purchasing our products Before using please read Instruction manual carefully and use the machine safely by following the instructions After reading please keep it where anyone can utilize ...

Страница 2: ...TION The instruction manual includes two signal words WARNING CAUTION which are meant as follows WARNING It is assumed that if the user uses the machine wrongly it would be the risks that the user could be died or injured CAUTION It is assumed that if the user uses the machine wrongly it would be the risks that the user could remain the disabled or damage for the materials CAUTION might cause the ...

Страница 3: ...CIFICATIONS 8 4 STANDARD ACCESSORIES 8 5 APPLICATIONS 8 6 GENERAL DRAWING AND SPECIFICATIONS IN OPERATION 9 7 OPERATIONAL INSTRUCTIONS 1 Anchoring Core Drill 10 2 Anchoring Core Drill by Anchor Bolt 10 8 MAINTENANCE AND SERVICING 1 Maintenance 12 2 Regular Servicing 12 9 FOR REPAIRING 15 10 INFORMATION ON NOISE EMISSIONS 15 11 WARRANTY 15 12 CE DECLARATION OF CONFORMITY 16 ...

Страница 4: ... Wear cap or hair cover in case that you have long hair 5 Wear ear protector such as earplug or ear muffs Wear ear protector in the place of noise 6 Wear safety glasses Wear safety glasses during working If there is dust please wear the dust mask 7 Do not work with improperly posture Fix the footing and maintain the balance at all times 8 Work carefully without staying alert When using the electri...

Страница 5: ...tch please make sure that the key and the wrench which are used for the inspection and adjusting are removed 15 The electric machines are maintained carefully Regarding exchanging the options please follow the instruction Keep the grip dry and clean and avoid the oil or grease Inspect the cord regularly In case that there are damages please contact to the distributors or CONSEC for repairing In ca...

Страница 6: ...hen please start operating 6 Use the proper voltage which is indicated on the nameplate In case that you apply for the voltage which is over the indicated voltage it will cause the accidents 7 Fix the Pole Base properly It is extremely important to fix the pole base securely If it is not fixed securely the Core Bit might be damaged by rattling of Core Drill or jammed 8 Use the Water Collector for ...

Страница 7: ...afely and efficiently 2 When drilling please supply the water for sure Overheating of Core Bit reduces not only drilling performance but also its life So make sure to keep supplying water during drilling operation Use clean water only Using the dirty water may cause machine failure 3 Do not turn on the motor with Core Bit facing to the drilling surface It causes the damages for Core Bit and Core D...

Страница 8: ...le Base After combining with Drill Carriage and Pole Base the distributor must make a CE marking and issue CE DECLARATION OF CONFORMITY 2 Drill Carriage Assy and Pole Base which are mounted on Drill Motor must have capacity of specified Max drilling diameter or larger capacity If combined with Drill Carriage Assy and Pole Base which have lesser capacity Drill Motor cannot function fully and this c...

Страница 9: ...Standard Accessories Motor Water Cock Switch Built in Circuit Breaker Carbon Cap Name Plate Feeding Handle Unified screw 1 1 4 7 UNC The outside of Main Shaft Lock Dial 247 328 PRCD Cord 2 4m Clamp Adjust Bolt Hex Socket Set Screw Grip G 1 2 The inside of Main Shaft 419 ...

Страница 10: ...ing cord 11 3kg Max Burst Pressure Hose 3 9MPa 4 STANDARD ACCESSORIES Hose Band 00 1 Hose 12 250 1 Water Cock 1 4 Gardena 1 Hex Bar Wrench 4mm 1 Instruction Manual 1 5 APPLICATIONS This tool is Core Drill for drilling in concrete Core Drilling in concrete for road dam tunnel and bridge construction Sampling test pieces Core Drilling of pilot hole for guard rail post and fence post Core Drilling in...

Страница 11: ...ECIFICATIONS IN OPERATION Drill Head installed on to 49 Pole Base Drill Motor Feeding Handle Core Bit Water Collector 49 Drill Carriage Assy Bolt Square Washer Hex Nut Leveling Bolt Water Collector Fitting Drill Head 49 Pole Base ...

Страница 12: ...o as to align main shaft with the hole to be drilled 5 Adjust leveling with leveling bolts so as to eliminate rattling of pole base After completion of adjustment secure leveling bolt with wing nut 6 Tighten hex nut to secure Pole Base 3 Installation of Core Bit Thread Core Bit onto main shaft 4 Installation of Water Collector Secure Water Collector with Water Collector Fitting WARNING Be sure to ...

Страница 13: ...ontact with work surface While starting to drill apply light pressure on feeding handle until drill bit penetrates to 5 10mm depth Then keep drilling under uniform pressure WARNING 1 If motor is switched on with Core Bit contacts on the work surface it causes Core Bit fracturing or Core Drill failure resting in hazardous accidents 2 Wait until the rotation of Core Bit increases to the full and the...

Страница 14: ...d with the soapy water 2 Maintenance for motor After entire operation is over secure Drill Head onto Pole Base run motor with no load and remove dirt and dust from motor interior 2 Regular Servicing 1 Checking of carbon brush 1 How to check Remove Carbon Brush Cap using flathead screw driver etc and take Carbon Brush out After replacement secure carbon cap 2 Item to be checked If the wearing of th...

Страница 15: ... feeding handle gets heavy When slide plate is worn and starts to rattle replace it 3 Checking and adjustment of clutch As Friction Plates wear out the clutch becomes easy to slip When this happens readjust the clutch using clutch adjusting tools 1 Remove Hex Socket Cap Plug 1 8 from Gear Case by Hex Bar Wrench 5mm 2 Insert the tip of Clutch Adjusting Pin into the hole where the plug 1 8 is remove...

Страница 16: ...t is locked Turn the motor switch on for just a moment and make sure that the clutch is slipping without motor locking WARNING Be careful for the position of Single ended Wrench 36mm touching on pole See the drawing 6 After making sure the clutch is slipping install Hex Plug 1 8 back into the hole 4 Checking of attaching screws Check every attaching screws for loosening periodically If found loose...

Страница 17: ...ments at a distance of 1 meter from the surface of the machinery and at height of 0 8 meter from the floor during no load operation 11 WARRANTY We will guarantee the HAKKEN Core Drill SPN 202Ui for 6 months from the date of delivery During this period we will rectify material and production defects free of charge We are not responsible for any other damage direct nor indirect other than this This ...

Страница 18: ...PN 202Ui Council Directive 2006 95 EC 2004 108 EC 2006 42 EC Relative Standard EN292 1 EN292 2 EN55014 1 EN55014 2 EN61000 3 2 EN61000 3 3 EN61000 4 2 EN61000 4 4 EN61000 4 5 EN61000 4 6 EN61000 4 11 EN61029 1 EN61029 2 6 Year To Begin Affixing CE Marking 2013 Place Hiroshima Japan Signature Name Hidetaka Sasaki Title President Date July 2013 The documentation referred herein is retained in our au...

Страница 19: ... 17 MEMO ...

Страница 20: ... 18 Main office 4 6 8 Shoko Center Nishi ku Hiroshima 733 0833 Japan International Department 1 7 5 1 Sakaimachi Naka ku Hiroshima 730 0853 Japan Phone 81 82 297 3231 Fax 81 82 297 3230 E1940 1 ...

Отзывы: