12
EN
General warnings
1
The hot water storage tank has to be put into operation and first started by
a professional technician in compliance with the effective regulations and
laws for putting into operation, as well as with any requirements of the local
authorities and public health organisations. Before turning on the heating,
the storage tank has to be filled up with water.
2
If the hot water storage tank to be put into operation does not only replace
an existing equipment, but it is part of the renewal of the existing hydraulic
system or of a new hydraulic system, the company putting the hot water
storage tank into operation – when it has been put into operation – shall
issue a declaration of conformity, certifying that effective laws and
specifications are met. The company putting the equipment into operation
in both cases shall carry out safety and operational checks for the whole
system.
3
Any zincked steel pipe, plastic pipe and red copper pipe can be used as hot
or cold water pipes. In case of connecting red copper pipes to the pipeline
system, the use of insulating intermediate pieces is compulsory. It is
prohibited to connect the hot water storage tanks with a hose.
4
Improper connection may involve the injury of persons and animals, or it
may cause damage to objects. The manufacturer shall not be liable for the
above.
5
It is prohibited to mount a pipeline fitting between the safety valve and the
equipment.
6
It is prohibited to close the outlet tube and to drain leakage in a non-visible
way.
7
It is life hazardous and prohibited to put the storage tank and the heat
exchanger under a pressure exceeding the allowed operation pressure (0.7
MPa). If the water pressure in the system exceeds the value of 0.6 MPa even
temporarily, a pressure reducing valve has to be mounted in front of the hot
water storage tank.
8
It is prohibited to operate the hot water storage tank without protective
earthing.
Содержание ID20A
Страница 18: ...18 RU 1 2 3 4 5 6 7 0 6 8 9 10 11 12 50 C 13 8...
Страница 19: ...19 14 HAJD Hajd s gi Ipari Zrt AQUASTIC 15 40 80...
Страница 20: ...20 RU 2 45 ID A 1 700 2 150 190 ID S 1 50 2 200 3 2 1...
Страница 21: ...21 RU 1 1a 1b ID A 2 2a 2 b ID S HAJDU Zrt 2 0 7 0 0 0 6 1 b 2 b...
Страница 22: ...22 RU 0 6 8 3 9 0 8 0 9 5 20 95 95 6 ID S 26 65...
Страница 23: ...23 RU RCD MSZ HD 60364...
Страница 24: ...24 RU 10 0...
Страница 26: ...26 RU ID25S ID40S ID50S 100 150 190 0 6 0 7 65 C 24 1 3 1 7 2 1 2 0 615 0 81 0 6 G3 4 G1...
Страница 39: ...39 HU EN RU 1 b bra Figure 1 b P 1 b...
Страница 40: ...40 HU EN RU 2 a bra Figure 2 a P 2 a 2 b bra Figure 2 b P 2 b...
Страница 42: ...42...
Страница 43: ...43...