Haier HSU-09HVD03/R2 - annexe 2 Скачать руководство пользователя страница 6

Outdoor unit

1.Installation of Outdoor Unit

3.Connection

4.Attaching Drain-Elbow

2.Connection of pipes

Install according to

To bend a pipe, give the roundness as large as possible not to crush the pipe ,and the bending radius

should be 30 to 40 mm or longer.

Connecting the pipe of gas side first makes working easier.

The connection pipe is specialized for R410A.

The max vertical distance between the indoor unit and the outdoor unit is 5 m.

Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 5m, the function of the unit will be affected. If the pipe has
to be lengthened, the refrigerant should be charged, according to 20 g/m. But the charge of refrigerant
must be conducted by professional air conditioner engineer. Before adding additional refrigerant,
perform air purging from the refrigerant pipes and indoor unit using a vacuum pump,then charge
additional refrigerant.

Use the same method on indoor unit. Loosen the screws on terminal block and insert the  plugs fully into
terminal block, then tighten the screws.

If wiring is not correct, proper operation can not be carried out and controller may be damaged.

 If the drain-elbow is used, please attach it as
 figure. (Note: Only for heat pump unit.)

Forced fastening without careful centering
may damage the threads and cause a
leakage of gas.

Pipe Diameter   (     )

Liquid side  6.35mm(1/4")

Gas side  9.52mm(3/8")

Fastening torque

Drawing for the installation of indoor and outdoor units

1.Remove the four screws of change-for-fresh-air box from the back cover.
2.Use six screws to fix the change new wind box onto the designated position on the outdoor unit.
3.Remove two screws of the pipe junction of the change new wind box, then insert the flared departure of
   the change for fresh air tube into the pipe junction and then fix with the screws.
4.Use four screws to fix the change-for-fresh-air box onto the back cover, as illustrated:

Fresh air  box

Fresh air
   box

Fresh air tube

Fresh air tube

Fresh air tube

Screw
 hole

Dust
filtration
mesh

Screw

Screw

Joint of tube

Flared departure

5.Installation instruction on the outdoor part of the fresh air device

 back
cover

Note:After wiring, the connecting terminals of outdoor unit and change-fresh-air as well as the wiring sheath should be
placed in the change-for-fresh-air box against the rain.

Insert the cable according to terminal number in the same manner as the indoor unit.

Fix the cable with a clamp.

Connecting terminal

Fresh air signal wire
  (with guard ring)

 Change-for-fresh-air box

18N.m

40N.m

Half union

Flare nut

Spanner

Torque wrench

6

Gas side  12.7mm(1/2")

55N.m

Содержание HSU-09HVD03/R2 - annexe 2

Страница 1: ...nd the floor should be more than 2m more than 10cm more than 10cm more than 10cm Adhesive tape Saddle L S with screws Attention must be paid to the rising up of drain hose Arrangement of piping directions Rear left Rear right Left Below Right Connecting electric cable for indoor and outdoor Drain hose Heating insulating material Piping hole cover Read this manual before installation 1 Driver 2 Hac...

Страница 2: ...n be left In the case of fixing the remote controller on a wall place where the indoor unit can receive signals when the fluorescent lamps in the room are lightened Place which is less affected by rain or direct sunlight and is sufficiently ventilated Place possible to bear the unit where vibration and noise are not increased Place where discharged wind and noise do not cause a nuisance to the nei...

Страница 3: ...us article When the mounting plate is first fixed for the position of wall hole Fix to side bar and lintel a mounting bar Which is separately sold and then fasten the plate to the fixed mounting bar Make a hole of 70 mm in diameter slightly descending to outside the wall Install piping hole cover and seal it off with putty after installation Section of wall hole Piping hole pipe Outdoor side Thick...

Страница 4: ... outside the room cable into left side of the wall hole in which the pipe has already existed 2 Pull out the cable on the front side and connect the cable making a loop signal wire Change for fresh air tube 1 Insert the drain hose into the dent of heat insulation materials of indoor unit 2 Insert the indoor outdoor electric cable from backside of indoor unit and pull it out on the front side then ...

Страница 5: ...n please change it with the type of T 3 15A 250V 3 The wiring method should be in line with the local wiring standard 4 After installation the power plug should be easily reached 5 6 Easily demount cleaning of indoor unit 1 Top inlet can be taken down Open the inlet grille press the claw of the clip on the unit then take down the top inlet according to figure 1 claw of the clip Figure 1 Figure 2 F...

Страница 6: ...ease attach it as figure Note Only for heat pump unit Forced fastening without careful centering may damage the threads and cause a leakage of gas Pipe Diameter Liquid side 6 35mm 1 4 Gas side 9 52mm 3 8 Fastening torque Drawing for the installation of indoor and outdoor units 1 Remove the four screws of change for fresh air box from the back cover 2 Use six screws to fix the change new wind box o...

Страница 7: ...as leakage No gas leakage In case of gas leakage tighten parts of pipe connection If leakage stops then proceed steps Detach the charge hose from the service port open 2 way valve and 3 way Turn the valve rod anticlockwise until hitting lightly To prevent the gas leakage turn the service port s cap the valve rod s cap for 2 way valve and 3 way s a little more than the point where the torque increa...

Страница 8: ...rried out Please install the drain hose so as to be downward slope without fail Please don t do the drainage as shown below Please pour water in the drain pan of the indoor unit and confirm that drainage is carried out surely to outdoor In case that the attached drain hose is in a room please apply heat insulation to it without fail Please kindly explain to our customers how to operate through the...

Страница 9: ...ier Road Qingdao P R China IT CE All the products are in conformity with the following European provision Electromagnetic CompatibilitY 89 336 EEC ROHS The products are fulfilled with the requirements in the directive 2002 95 EEC of the European parliament and of the council on the Restriction of the use of Certain Hazardous Sub stances in Electrical and Electronic Equipment EU RoHS Directive WEEE...

Страница 10: ...DIRECTIVES EUROPÉENNES POUR LES MODÈLES Haier Industrial Park No 1 Haier Road Qingdao P R China FR CE Alle Produkte erfüllen die folgenden europäischen Richtlinien EMV Richtlinie 89 336 EWG ROHS Das Produkt erfüllt die Richtlinie 2002 95 EWG zur Beschrän kung der Verwendung bestimmter gefährlicher Stoffe in Elektro und Elektronikgeräten WEEE Verbraucherinformation laut europäischer Richtlinie 2002...

Отзывы: