English
4.2 Wiring diagram
SECTION 5 - START UP CONTROLS
Before starting the unit check the following:
• Anchorage of the unit to the ceiling.
• Connection of the air ducts.
• Connection of the earth cable.
• Fixing of all the electric terminals.
Installation, Use and Maintenance Manual - HACI-RP DX series
pag. 47
L =
lin
ea /
lin
e
N
=
ne
utro
/
ne
utra
l
PE
=
te
rra
/
pr
ot
ec
tive ea
rth
Vm
r
e
d
G
N
D bl
ack
Vc
c
wh
ite
V
sp ye
llow
FG
bl
ue
M1
Vm
r
e
d
G
N
D bl
ack
Vc
c
wh
ite
V
sp ye
llow
FG
bl
ue
M2
Run
n
in
g
s
ig
n
al
Fa
u
lt s
ig
n
al
Low
s
p
e
e
d
Me
d
ium
s
p
e
e
d
ex
ha
ust
fa
n
su
p
p
ly
fa
n
By
p
a
ss
El
ectr
ic
a
l he
a
ter
Ma
x
s
pee
d
Di
ff
e
ren
ti
a
l
pr
ess
u
re
swit
c
h
RA
Pr
o
b
e
FR E
A
Pr
o
b
e
OA
Pr
o
b
e
SA
P
robe
CO2
P
robe
Con
trol
Pa
n
e
l
Pr
e
s
so
s
ta
to
di
ff
er
e
n
z
ia
le
(F
iltri
spor
c
h
i)
SI
C
BO
AR
D
S
c
hed
a p
rin
c
ipa
le
LN
FA
N
Содержание HACI-RP DX 100
Страница 52: ...2020 06 ...